current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarverification of terminal marking & polarity testing lab in srinagaris 2705 (part 1) cl. no. 8.2 is 16227(part 1) cl. no. 7.3.6 is 16227(part 2) cl. no. 7.3.6 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarlimits of current error and phase displacement testing lab in srinagaris 2705 (part 2) cl. no. 3.3 is 16227(part 1) cl. no. 7.3.5 is 16227(part 2) cl. no. 7.3.5 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarac voltage test testing lab in srinagaris 13779 cl. no. 12.7.6.3 is 14697 cl. no. 12.7.6.3 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarinsulation resistance testing lab in srinagaris 13779 cl. no. 12.7.6.4 is 14697 cl. no. 12.7.6.4 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarlimits of errors testing lab in srinagaris 13779 cl. no. 11.1 is 14697 cl. no. 11.1 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarmeter constant testing lab in srinagaris 13779 cl. no. 11.6 is 14697 cl. no. 12.14 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarstarting conditions testing lab in srinagaris 13779 cl. no. 12.14 is 14697 cl. no. 12.13 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarno-load condition testing lab in srinagaris 13779 cl. no. 12.13 is 14697 cl. no. 12.12 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarrepeatability of error testing lab in srinagaris 13779 cl. no. 12.17 is 14697 cl. no. 12.16 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarinitial start-up of the energy meter testing lab in srinagaris 13779 cl. no. 11.4.1 is 14697 cl. no. 11.4.1 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarpower consumption testing lab in srinagaris 13779 cl. no. 9.1 is 14697 cl. no. 9.1 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarverification of average frequency slot testing lab in srinagarcentral electricity authority notification no:502/70/cea/dp&d dtd: 17/03/2006 schedule part ii 1b standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarverification of reactive energy registration in total, low and high var registers testing lab in srinagarcentral electricity authority notification no:502/70/cea/dp&d dtd: 17/03/2006 schedule part ii 1b standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarshort circuit impedance and load losses testing lab in srinagaris 2026 (part 1) cl. no. 10.4 is 1180 (part 1) cl. no. 21.2c is 11171, iec 60076 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarno load losses and current testing lab in srinagaris 2026 (part i) cl. no. 10.5 is 1180 (part i) cl. no. 21.2d standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagartemperature rise testing lab in srinagaris 2026(part ii) cl. no. 5, 10.4 is 2026 (part i) cl. no. 5.6 is 1180 (part i) cl. no. 21.2, 21.3 b 6.10, 7.10, 8.10) standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarinduced ac voltage test testing lab in srinagar(cl. no. 12.1) is 2026 (part iii) cl. no. 12.1 is 11171 cl. no. 15 is 1180 (part i) cl. no. 21.2f standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarseparate source ac withstand voltage test testing lab in srinagaris 2026 (part iii) cl. no. 11 is 11171 cl. no. 14.1 is 1180 (part i) cl. no. 21.2g standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarunbalanced current testing lab in srinagarcbip publication no. gp 317: 2013 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarzero sequence impedance for 3 phase transformer testing lab in srinagaris 2026 (part-i) cl. no. 10.7 is 11171 is 1180 (part i) standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarair pressure testing lab in srinagaris 1180 (part 1) cl. no. 15.2, 21.5, 21.5.1, 21.5.1.2 , 21.5.2.1, 21.5.2.2 21.5.3.1, 21.5.3.2) cbip publication no 317: 2013 cl. no. 17.3,3 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarvacuum testing lab in srinagaris 1180 (part 1) cl. no. 15.2, 21.5, 21.5.1, 21.5.1.2 , 21.5.2.1, 21.5.2.2 21.5.3.1, 21.5.3.2) cbip publication no 317: 2013 cl. no. 17.3.3 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagaroil leakage testing lab in srinagaris 1180(part 1) cl. no. 21.2j, 21.5, 21.5.1.3, 21.5.2.3, 21.5.3.3 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarpaint adhesion testing lab in srinagaris 1180 (part 1) cl. no. 21.4d astm d 3359 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarmoisture content of oil in the transformer testing lab in srinagaris 1180 (part 1) cl. no. 21.4 e, is 335:1993 cl. no. 3.5 is 2026 (part i) is 13567 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarbdv in the transformer testing lab in srinagaris 1180 (part 1):2014 cl. no. 21.4 e, (is 335:1993 cl 3.5) is 2026 (part i) is 13567 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarpermissible flux density and over fluxing testing lab in srinagaris 1180 (part 1) cl. no. 6.9, 7.9, 8.9 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarsound level testing lab in srinagaris 1180:2014, cl. no. 21.4 a is 2026 : 2011 part 1. standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarcl. no. 10.1.3 cbip publication no 317: 2013 is 2026 (part10) : 2009 is 13964 : 1994 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarharmonics of the no load current testing lab in srinagaris 2026 part 1: 2011 cl. no. : 10.6 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarwinding resistance testing lab in srinagaris 2026 (part i) cl. no. 10.2 is 1180 (part 1) cl. no. 21.2 a is 11171 iec: 60076 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarvoltage ratio and check of phase displacement (vector group) testing lab in srinagaris 2026 (part i) cl. no.10.3 is 1180 (part 1) cl. no. 21.2 b, 6.5, 6.6. 7.5, 7.6, 8.5, 8.6 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarinsulation resistance to earth of the windings testing lab in srinagaris 2026 (part i) cl. no. 10.1.3, 16.6 is 1180 (part 1) cl. no. 21.2 e standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarmagnetic balance test at low voltage testing lab in srinagarcbip publication no 317: 2013 standard testing lab in srinagar
current transformer 1 a – 3200 a / 5 – 1a testing lab in srinagarmagnetizing current at low voltage testing lab in srinagarcbip publication no 317: 2013 is 2026(part-i):2011 standard testing lab in srinagar
distribution/power transformers upto 100 mva 220 kv class testing lab in srinagarwinding resistance testing lab in srinagaris 2026 (part i) cl. no. 10.2 is 1180 (part 1) cl. no. 21.2 a is 11171 iec: 60076 standard testing lab in srinagar
distribution/power transformers upto 100 mva 220 kv class testing lab in srinagarvoltage ratio and check of phase displacement (vector group) testing lab in srinagaris 2026 (part i) cl. no.10.3 is 1180 (part 1) cl. no. 21.2 b, 6.5, 6.6. 7.5, 7.6, 8.5, 8.6 standard testing lab in srinagar
distribution/power transformers upto 100 mva 220 kv class testing lab in srinagarinsulation resistance to earth of the windings testing lab in srinagaris 2026 (part i) cl. no. 10.1.3, 16.6 is 1180 (part 1) cl. no. 21.2 e standard testing lab in srinagar
distribution/power transformers upto 100 mva 220 kv class testing lab in srinagarmagnetic balance test at low voltage testing lab in srinagarcbip publication no 317: 2013 standard testing lab in srinagar
distribution/power transformers upto 100 mva 220 kv class testing lab in srinagarmagnetizing current at low voltage testing lab in srinagarcbip publication no 317: 2013 is 2026 (part 1) standard testing lab in srinagar
distribution /power transformers , upto 33 kv class testing lab in srinagarfull wave lightning impulse test for the line terminals (li) testing lab in srinagaris 2026-3 cl. no. 13, 14 iec 60076-3 cl. no. 13 is 1180-1 cl. no. 21.3.a is 11171 cl. no. 16 iec 60076-11 cl. no. 21 standard testing lab in srinagar
distribution /power transformers , upto 33 kv class testing lab in srinagarchopped wave lightning impulse test for theline terminals (lic) testing lab in srinagaris 2026-3 cl. no. 14 is 1180-1 cl. no. 21.3.a iec:60076- 3 cl. no. 14 table 4 of iec 60076-11 cbip 217:2013 cl. no. 6.2 standard testing lab in srinagar
distribution /power transformers , upto 33 kv class testing lab in srinagarlightning impulse test for the neutral terminals (lin) testing lab in srinagariec 60076-03cl.no. 13.3.2 is 2026-03 cl. no. 13.3.2 is 1180-1 cl. no. 21.3.a standard testing lab in srinagar
current transformer upto 33 kv testing lab in srinagarlightning impulse testing lab in srinagaris 2705 (part 1) cl. no. 9.8 is 16227-1 cl. no. 7.2.3.2 is 16227 (part 4) cl. no. 7.2.3 is 16227 (part 2) cl. no. 7.2.3 standard testing lab in srinagar
potential transformer up to 33 kv testing lab in srinagarlightning impulse voltage test on primary terminal testing lab in srinagaris 3156 (part 1) cl. no. 9.6 is 16227-1 cl. no. 7.2.3.2 is 16227 (part 4) cl. no. 7.2.3 is 16227 (part 3) cl. no. 7.2.3 standard testing lab in srinagar
potential transformer up to 33 kv testing lab in srinagarchopped impulse for external insulation testing lab in srinagaris 3156 (part 1) cl. no. 9.8 is 16227 (part 4) cl. no. 7.4.1 is 16227 (part 3) cl. no. 7.4.1 standard testing lab in srinagar
insulator,bushing upto 36 kv testing lab in srinagardry impulse withstand voltage testing lab in srinagaris 731 cl. no. 10.3 is 2544 cl. no. 9.3 is 9431 cl. no. 9.2 is 2099 cl. no. 11.4 standard testing lab in srinagar
insulator,bushing upto 36 kv testing lab in srinagarfifty percent dry impulse flashover voltage testing lab in srinagaris 731 cl. no. 10.3.5 is 2544 cl. no. 9.3.6 is 9431 cl. no. 9.2 is 2099 cl. no. 11.4 standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarvoltage ratio testing lab in srinagariec 60076-01 : 2011 (clause 10.3) is 2026-01 : 2011 (clause 10.3) ieee c57.12.00 : 2010 (table 18) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarcheck of winding polarity / check of vector group testing lab in srinagariec 60076-01 : 2011 (clause 10.3) is 2026-01 : 2011 (clause 10.3) table 18 of ieee c57.12.00 : 2010 standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarwinding resistance testing lab in srinagariec 60076-01 : 2011 (clause 10.2) is 2026-01 : 2011 (clause 10.2) ieee c57.12.00 : 2010 (table 18 standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarcapacitance testing lab in srinagariec 60076-01 : 2011 (clause 10.1.3 (b)) is 2026-01 : 2011 (clause 10.1.3 (b)) ieee c57.12.00 : 2010 (table 18) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagartan delta testing lab in srinagariec 60076-01 : 2011 (clause 10.1.3 (b)) is 2026-01 : 2011 (clause 10.1.3 (b)) ieee c57.12.00 : 2010 (table 18) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarmagnetic balance test testing lab in srinagarcbip section - bb : 2013 (clause 3.17) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarinsulation resistance of windings, core, frame &tank. testing lab in srinagariec 60076-01: 2011 (clause 10.1.3 (i)) is 2026-01: 2011 (clause 10.1.3 (i)) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarno load losses and current testing lab in srinagariec 60076-01 : 2011 (clause 10.5) is 2026-01 : 2011 (clause 10.5) ieee c57.12.90 : 2010 (clause.8) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarshort-circuit impedance and load loss testing lab in srinagariec 60076-01 : 2011 (clause 10.4) is 2026-01 : 2011 (clause 10.4) ieee c57.12.90 : 2010 (clause.9) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarfull wave lightning impulse test for the line terminals (li) testing lab in srinagariec 60076-03 : 2013 (clause 13.2) is 2026-03 : 2009 (clause 13) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarchopped wave lightning impulse test for the line terminals (lic) testing lab in srinagariec 60076-03 : 2013 clause 13.3 is 2026-03 : 2009 clause 14 ieee c57.12.90 : 2010 clause.10.3 standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarlightning impulse test for the neutral terminals (lin) testing lab in srinagariec 60076-03 : 2013 (clause 13.4) is 2026-03 : 2009 (clause 13.3.2) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarswitching impulse test for the line terminal (si) testing lab in srinagariec 60076-03 : 2013 (clause 14) is 2026-03:2009 (clause 15) ieee c57.12.90 : 2010 (clause.10.2) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarapplied voltage test (av) / separate source ac withstand voltage test testing lab in srinagariec 60076-03 : 2013 (clause 10) is 2026-03 : 2009 (clause 11) ieee c57.12.90 : 2010 (clause.10.6) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarinduced voltage withstand test (ivw) testing lab in srinagariec 60076-03 : 2013 (clause 11.2) is 2026-03 : 2009 (clause 12) ieee c57.12.90 : 2010 (clause.10.8) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarinduced voltage test with pd measurement (ivpd) testing lab in srinagariec 60076-03 : 2013 (clause 11.3) is 2026-03 : 2009 (clause 12.4) ieee c57.12.90 : 2010 (clause.10.8) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarline terminal ac withstand voltage test (ltac) testing lab in srinagariec 60076-03 : 2013 (clause 12) is 2026-03 : 2009 (clause 12.2 & 12.3) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarauxiliary wiring (auxw) & magnetic circuit insulation test testing lab in srinagariec 60076-03 : 2013 (clause 9) is 2026-03 : 2009 (clause 10) ieee c57.12.00 : 2010 table 18 standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagartests on on-load tap-changers testing lab in srinagariec 60076-01 : 2011 (clause 10.8) is 2026-01 : 2011 (clause 10.8) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagartemperature rise test testing lab in srinagariec 60076-02 : 2011 (clause 7) is 2026-02 : 1977 (clause 4) ieee c57.12.90 : 2010 (clause.11) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagartransient voltage transfer characteristics testing lab in srinagariec 60076-03 : 2013 (clause b2) annex-b is 2026-03 : 2009 (clause 13.3.3) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarsound levels testing lab in srinagariec 60076-10 : 2001 (clause 11) is 2026-01 : 2011 (clause 10.1.3(f)) ieee c57.12.90 : 2010 (clause.13.5) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarzero-sequence impedance(s) on three-phase transformers testing lab in srinagariec 60076-01 : 2011 (clause 10.7) is 2026-01 : 2011 (clause 10.7) ieee c57.12.90 : 2010 (clause.9.5) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarharmonics of the no-load current testing lab in srinagariec 60076-01 : 2011 (clause 10.6) is 2026-01 : 2011 (clause 10.6) ieee c57.12.90 : 2010 (clause.8) standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarpower taken by the fan and oil pump motors testing lab in srinagariec 60076-01 : 2011 (clause 10.1.3(h)) is 2026-01 : 2011 (clause 10.1.3(h)) ieee c57.12.00 : 2010 table 18 standard testing lab in srinagar
power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in srinagarsweep frequency response analysis (sfra) test testing lab in srinagariec 60076-18 : 2010 standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarwinding resistance testing lab in srinagariec 60076-06 : 2007 (clause 7.8.2) iec 60076-01 : 2011 (clause 10.2) is 2026-01 : 2011 (clause 10.2) ieee c57.12.00 : 2010 table 18 standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarcapacitance testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-01 : 2011 (clause 10.1.3 (b)) is 2026-01 : 2011 clause 10.1.3 (b) ieee c57.12.00 : 2010 table 18 standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarinsulation resistance of windings, core, frame and shields. testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-01: 2011 (clause 10.1.3 (i)) is 2026-01: 2011 (clause 10.1.3 (i)) ieee c57.12.90:2010 (clause. 10.11) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarfull wave lightning impulse test for the line terminals testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 13.2) is 2026-03 : 2009 (clause 13) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarchopped wave lightning impulse test for the line terminals (lic) testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 13.3) is 2026-03 : 2009 (clause 14) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarlightning impulse test for the neutral terminals (lin) testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 13.4) is 2026-03 : 2009 (clause 13.3.2) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarswitching impulse test for the line terminal (si) testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 14) is 2026-03 : 2009 (clause 15) ieee c57.12.90 : 2010 clause.10.2 standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarapplied voltage test (av) / separate source ac withstand voltage test testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 10) is 2026-03 : 2009 (clause 11) ieee c57.12.90 : 2010 (clause.10.6) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarinduced voltage withstand test (ivw) testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 11.2) is 2026-03 : 2009 (clause 12) ieee c57.12.90 : 2010 (clause.10.8) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarinduced voltage test with pd measurement (ivpd) testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 11.3) is 2026-03 : 2009 (clause 12.4) ieee c57.12.90 : 2010 (clause.10.8) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarline terminal ac withstand voltage test (ltac) testing lab in srinagariec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 12) is 2026-03 : 2009 (clause 12.2 & 12.3) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarauxiliary wiring (auxw) & magnetic circuit insulation test testing lab in srinagariec 60076-06 : 2007 (clause 7.8.3) iec 60076-03 : 2013 (clause 9) is 2026-03 : 2009 (clause 10) ieee c57.12.00 : 2010 table 18 standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagartemperature rise test testing lab in srinagariec 60076-06 : 2007 (clause 7.8.14) iec 60076-02 : 2011 (clause 7) is 2026-02 : 1977 (clause 4) ieee c57.12.90 : 2010 (clause.11) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarsound levels testing lab in srinagariec 60076-06 : 2007 (clause 7.8.12) iec 60076-10 : 2001 (clause 11) is 2026-01 : 2011 (clause 10.1.3(f)) ieee c57.12.90 : 2010 (clause.13.5) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarharmonics of the no-load current testing lab in srinagariec 60076-06 : 2007 (clause 7.8.7) iec 60076-01 : 2011 (clause 10.6) is 2026-01 : 2011 (clause 10.6) ieee c57.12.90 : 2010 (clause.8) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarpower taken by the fan and oil pump motors testing lab in srinagariec 60076-06 : 2007 (clause 7.8.3) iec 60076-01 : 2011 (clause 10.1.3(h)) is 2026-01 : 2011 (clause 10.1.3(h)) ieee c57.12.00 : 2010 table 18 standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarsweep frequency response analysis (sfra) test testing lab in srinagariec 60076-18 : 2010 standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarreactance & loss testing lab in srinagariec 60076-06 : 2007 (clause 7.8.5 & 7.8.6) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarvibration testing lab in srinagariec 60076-06 : 2007 (clause 7.8.13) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagarstrain and stress testing lab in srinagariec 60076-06 : 2007) (clause 7.8.13) standard testing lab in srinagar
reactors upto 110mvar,765kv testing lab in srinagardetermination linearity of reactance. testing lab in srinagariec 60076-06 : 2007 clause 7.8.5.3 standard testing lab in srinagar
loco transformer upto 7.5 mva, 25kv testing lab in srinagarvoltage ratio testing lab in srinagariec 310: 1991-11 clause 20 standard testing lab in srinagar
loco transformer upto 7.5 mva, 25kv testing lab in srinagarwinding resistance testing lab in srinagariec 310: 1991-11 clause 19 standard testing lab in srinagar
loco transformer upto 7.5 mva, 25kv testing lab in srinagarinsulation resistance of windings testing lab in srinagariec 60076-01: 2011 clause 10.1.3 (i) is 2026-01: 2011 clause 10.1.3 (i) ieee c57.12.90 : 2010 clause. 10.11 standard testing lab in srinagar
loco transformer upto 7.5 mva, 25kv testing lab in srinagarno load losses and current testing lab in srinagariec 310: 1991-11 clause 21.2 standard testing lab in srinagar
loco transformer upto 7.5 mva, 25kv testing lab in srinagarshort-circuit impedance and load loss testing lab in srinagariec 310: 1991-11 clause 22 & 23 standard testing lab in srinagar
loco transformer upto 7.5 mva, 25kv testing lab in srinagarseparate source ac withstand voltage test testing lab in srinagariec 310: 1991-11 clause 36.2 standard testing lab in srinagar
loco transformer upto 7.5 mva, 25kv testing lab in srinagarinduced voltage withstand test testing lab in srinagariec 310: 1991-11 clause 26.1 standard testing lab in srinagar
loco transformer upto 7.5 mva, 25kv testing lab in srinagartemperature rise test testing lab in srinagariec 310: 1991-11 clause 25 standard testing lab in srinagar
loco transformer upto 7.5 mva, 25kv testing lab in srinagarfull wave lightning impulse test for the line terminals testing lab in srinagariec 60076-03 : 2013 clause 13.2 is 2026-03 : 2009 clause 13 ieee c57.12.90 : 2010 clause.10.3 standard testing lab in srinagar
mineral oil testing lab in srinagarelectric strength breakdown voltage (bdv) testing lab in srinagariec 60156:1995 is 6792 (2003 ) standard testing lab in srinagar
mineral oil testing lab in srinagarwater content testing lab in srinagariec 60814:1997 is 13567 (ra 2003) standard testing lab in srinagar
mineral oil testing lab in srinagarspecific resistance testing lab in srinagariec 60247:2004 is 6103 (ra 2006 ) standard testing lab in srinagar
mineral oil testing lab in srinagardielectric dissipation testing lab in srinagariec 60247:2004 is 6262 (ra 2006 ) standard testing lab in srinagar
mineral oil testing lab in srinagarinterfacial tension testing lab in srinagarastm d0971-12:2012 is 6104 (ra 2006) standard testing lab in srinagar
mineral oil testing lab in srinagardissolved gas analysis testing lab in srinagarastm d0971-12:2012 is 6104 (ra 2006) standard testing lab in srinagar
mineral oil testing lab in srinagarhydrogen testing lab in srinagariec 60567:2005 iec 60599:2007 ieee-c57.104 :1991 astm d3612-02:2002 standard testing lab in srinagar
mineral oil testing lab in srinagarco2 testing lab in srinagariec 60567:2005 iec 60599:2007 ieee-c57.104 :1991 astm d3612-02:2003 standard testing lab in srinagar
mineral oil testing lab in srinagarco testing lab in srinagariec 60567:2005 iec 60599:2007 ieee-c57.104 :1991 astm d3612-02:2004 standard testing lab in srinagar
mineral oil testing lab in srinagarhydrocarbons testing lab in srinagariec 60567:2005 iec 60599:2007 ieee-c57.104 :1991 astm d3612-02:2005 standard testing lab in srinagar
mineral oil testing lab in srinagarparticle count testing lab in srinagariso 4402:1992 & iso 11171:2016 standard testing lab in srinagar
internal combustion engines testing lab in srinagarfull load performance power testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarengine steady state cycle testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarco testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarthc testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarnox testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarpm testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarnh3 testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarengine transient cycle testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarco testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarthc testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarnox testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarpm testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarch4 testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarnh3 testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagar8 mode emission test testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarco testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarthc testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarnox testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarpm testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagar5 mode emission test testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarco testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarthc testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarnox testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarpm testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
internal combustion engines testing lab in srinagarerror code for obdii testing lab in srinagarmorth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kvvoltage ratio testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.3 iec60076-1 (2011) cl.no.11.3 ieee-c57.12.90 (2010) cl.no.7.0 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kvvector group testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.3 iec60076-1(2011) ) cl.no.11.3 ieee-c57.12.90 (2010) cl.no.6.0 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kvcheck of polarity testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.3 iec60076-1(2011) ) cl.no.11.3 ieee-c57.12.90 (2010) cl.no.6.0 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kvwinding resistance testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.2 iec60076-1(2011) ) cl.no.11.2 ieee-c57.12.90 (2010) cl.no.5.3 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mvainsulation resistance testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.1.3 (j) iec60076-1(2011) cl.no.11.1.2.2(b), cl.no.11.1.4 (h) standard testing lab in srinagar
three phase 7.5 mva to 500 mvaieee-c57.12.90 (2010) cl.no.10.11 standard testing lab in three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer singlecapacitance & tan delta insulation power factor testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.1.3 (b) iec60076-1(2011) cl.no.11.1.2.2 (a,c), cl.no.11.1.4 (c,d) ieee-c57.12.90 (2010) cl.no.10.10 standard testing lab in srinagar
three phase 7.5 mva to 500 mvaharmonics of no load current testing lab inis 2026 (part 1): 2011 cl.no.10.6 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kvload loss testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.4 iec60076-1(2011) ) cl.no.11.4 ieee-c57.12.90 (2010) cl.no.9.0 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mvaimpedance voltage testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.4 iec60076-1(2011) cl.no.11.4 ieee-c57(2010) ) cl.no.9.0 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phaseoltc testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.8 iec60076-1(2011) cl.no.11.7 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kvzero phase sequence impedance on three phase transformers & reactors testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.7 iec60076-1(2011) cl.no.11.6 ieee-c57.12.90 (2010) cl.no.9.5 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v16 testing lab in srinagartemperature rise testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.1.2 (a) standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v17 testing lab in srinagariec60076-2(2011) cl.no.11.1.3 (a) ieee-c57.12.90 (2010) cl.no.11 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v18 testing lab in srinagarseparate source voltage withstand testing lab in srinagaris 2026 (part 1): 2011 cl.no.11 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v19 testing lab in srinagarapplied voltage testing lab in srinagarieee-c57.12.90 (2010) cl.no.10.6 iec60076-3-(2018) cl.no.7.2.3 (c) standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v20 testing lab in srinagarline terminal ac withstand (ltac) induced voltage withstand ( ivw) testing lab in srinagariec60076-1(2011)& cl.no.7.2.3 (d) ieee-c57.12.90 (2010) cl.no.10.7 iec60076-3-(2018) cl.no.7.2.3 (e) standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v21 testing lab in srinagaracsd/acld voltage withstand with pd induced voltage with partial discharge (ivpd) testing lab in srinagaris 2026 (part 1): 2011 cl.no.12.2,12.3, 12.4 ieee-c57.12.90 (2010) cl.no.10.9 iec60076-3-(2018) cl.no.7.2.3 (d) standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v22 testing lab in srinagarlightning impulse (li, lic, lin, limt) testing lab in srinagaris 2026 (part 1): 2011 cl.no.13,13.3.2 ieee-c57.12.90 (2010) cl.no.10.3 iec60076-3-(2018) cl.no.7.2.3 (a) standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v23 testing lab in srinagarswitching impulse (si) testing lab in srinagaris 2026 (part 1): 2011 cl.no.15 ieee-c57.12.90 (2010) cl.no.10.2 iec60076-3-(2018) cl.no.7.2.3 (d) standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v24 testing lab in srinagarnoise level audible sound emission testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.1.3 (f) iec60076-10(2016) ieee-c57.12.90 (2010) cl.no.13 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v25 testing lab in srinagarpower taken by fan & pump (cooler loss) testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.1.3 (h)iec60076-1 (2011) cl.no.11.1.3 (c) standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v26 testing lab in srinagarct ratio error & phase angle error testing lab in srinagariec 61869-2 (2012) standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v27 testing lab in srinagarno load loss & excitation current testing lab in srinagaris 2026 (part 1): 2011 cl.no.10.5 iec60076- 1(2011) cl.no.11.5 ieee-c57.12.90 (2010) cl.no.8.0 standard testing lab in srinagar
three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v28 testing lab in srinagarsfra testing lab in srinagariec60076-1 cl.no.11.1.4 (l) standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarwinding resistance testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.3 (a) iec60076-6 (2007) cl.no.7.8.2 ieee-c57.12.90 (2010) cl.no.5.3 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarinsulation resistance testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.3 (b), iec60076-6(2007) cl.no.7.8.2 ieee-c57.12.90 (2010) cl.no.10.11 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarcapacitance tan delta testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.4 (h), iec60076-6(2007) cl.no.7.8.2/ieee-c57.12.90 (2010) cl.no.10.10 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarharmonicsofno load current testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.4 (e), iec60076-6(2007) cl.no.7.8.7 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarloss & reactance testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.3 (d), iec60076-6(2007) cl.no.7.8.5 ,7.8.6 ieee-c57.12.90 (2010) cl.no.8.0 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarlinearity of reactance testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.12, iec60076-6(2007) cl.no.7.8.5.3 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarzero sequence impedance on three phase reactors testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.4 (a), iec60076-6(2007) cl.no.7.8.8 ieee-c57.12.90 (2010) cl.no.9.5 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagartemperature rise testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.2 (g), iec60076-6(2007) cl.no.7.8.14 ieee-c57.12.90 (2010) cl.no.11 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarseparate source voltage withstand testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.11.1, iec60076-6(2007) cl.no.7.8.10.2 ieee-c57.12.90 (2010) cl.no.10.6 iec60076-3-(2018) standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarinduced over voltage testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.11.2, standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarinduced voltage withstand (ivw)& (ivpd ) testing lab in srinagariec60076-6 (2007) cl.no.7.8.10.3 ieee-c57.12.90 (2010) cl.no.10.9 iec60076-3-(2018) cl.no.7.2.3 (e) cl.no.7.2.3 (e) standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarlightning impulse (li,lic,lin,limt) testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.11.3 , iec60076-6(2007) cl.no.7.8.10.4 ieee-c57.12.90 (2010) cl.no.10.7 iec60076-3- (2013)&cl.no.7.2.3 (a) standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarswitching impulse testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.11.4, iec60076-6(2007) cl.no.7.8.10.6 ieee-c57.12.90 (2010) cl.no.10.2 iec60076-3-(2013) cl.no.7.2.3 (d) standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarnoise level testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.13, iec60076-6(2007) cl.no.7.8.12 (iec60076- 10(2016) ieee-c57.12.90 (2010) cl.no.13 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarpower taken by fan & pump (cooler loss) testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.4 (f), iec60076-1(2011) cl.no.11.1.3 (c) standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarvibration testing lab in srinagaris 5553 (part 2): 1990 cl.no.7.14, iec60076-6 (2007) cl.no.7.8.13 standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarct ratio error & phase angle error re pe testing lab in srinagariec61869-2 (2012) standard testing lab in srinagar
reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in srinagarsfra testing lab in srinagariec60076-1&cl.no.11.1.4 (l) standard testing lab in srinagar
electrical steel testing lab in srinagarsurface insulation resistivity testing lab in srinagarastm 717- (1995), iec 60404-11(1996) is 649-(1997) standard testing lab in srinagar
electrical steel testing lab in srinagarspecific core loss testing lab in srinagariec 60404-2 (1996), astm a343 (1997), is 649-(1997) standard testing lab in srinagar
electrical steel testing lab in srinagara. c. magnetization testing lab in srinagariec 60404-2 (1996), astm a343 (1997), is 649:1997 standard testing lab in srinagar
electrical steel testing lab in srinagarageing characteristic at 250 °c for 24hrs. core loss testing lab in srinagaris 649:1997 standard testing lab in srinagar
electrical steel testing lab in srinagarstacking factor testing lab in srinagaris 649:1997 standard testing lab in srinagar
electrical steel testing lab in srinagarbend testing lab in srinagaris 649:1997 standard testing lab in srinagar
insulating oil testing lab in srinagardensity testing lab in srinagariso 3675-(1998) astm d1298 (2005) bs 148 (7.2): (1998) is 1448 (part 16): 1976 standard testing lab in srinagar
insulating oil testing lab in srinagarbreak down voltage testing lab in srinagarastm d 877: (2007) bs 148 (1998) (7.11) iec 60156-07(1995), is 6792 (1998) standard testing lab in srinagar
insulating oil testing lab in srinagartan delta testing lab in srinagarastm d 924: (2004) bs 148 (1998) (7.12) iec 60247-02 (2004), is 6262 (1996) standard testing lab in srinagar
insulating oil testing lab in srinagarspecific resistivity at 27 °c & 90 °c testing lab in srinagaris 6103 (1996) standard testing lab in srinagar
insulating oil testing lab in srinagarwater content testing lab in srinagarastm d 1533: (2005) bs 148 (1998) (7.8) iec 60814-1-(1997) is 13567 : (1992) standard testing lab in srinagar
insulating oil testing lab in srinagarneutralisation value testing lab in srinagarastm d 974: (2007) bs 148 (1998) (7.6) iec 62021-12(2001) is 1448 -2 (1967) standard testing lab in srinagar
insulating oil testing lab in srinagarinter facial tension testing lab in srinagarastm d 971 (2004) is 6104 (1971) iso 6295: (1983) standard testing lab in srinagar
insulating oil testing lab in srinagarkinematic viscosity at 40° c testing lab in srinagarastm d 445:2006/bs 148(1998) (7.3)/iec608141(1997)/is 1448 -25-1976 standard testing lab in srinagar
insulating oil testing lab in srinagarkinematic viscosity at 27° c testing lab in srinagarastm d 445: (2006) bs 148 (1998) (7.3)iec 60814-1(1997)is 1448-25 (1976) standard testing lab in srinagar
insulating oil testing lab in srinagardissolved gas analysis testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
insulating oil testing lab in srinagarhydrogen testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
insulating oil testing lab in srinagaroxygen testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
insulating oil testing lab in srinagarnitrogen testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
insulating oil testing lab in srinagarcarbon monoxide testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
insulating oil testing lab in srinagarmethane testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
insulating oil testing lab in srinagarcarbon dioxide testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
insulating oil testing lab in srinagaracetylene testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
insulating oil testing lab in srinagarethylene testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
insulating oil testing lab in srinagarethane testing lab in srinagariec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in srinagar
power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)winding resistanceis 2026 (part 1) iec60076-1, cl.10.2 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)voltage ratio and check of voltage vector relationshipis 2026 (part 1) iec 60076-1, cl.10.3 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)impedance(principal tapping) and load lossis 2026 (part 1) iec60076-1, cl.10.4 , is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)no-load loss and currentis 2026 (part 1) iec60076-1, cl.10.5 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)insulationresistance& polarization indexdpltl/tp/04, issue 01, rev 00, date: 01/03/2016
power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)dielectric tests – separate-source voltage withstand test,is 2026 (part 3) iec60076-3, cl.11 power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)inducedovervoltage withstand testis 2026 (part 3) iec60076-3, cl.12 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)temperature riseis 2026 (part 2) iec60076-2 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)zero-sequence impedance of three phase transformeris 2026 (part 1) iec60076-1, cl. 10.7 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage class up to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)magnetic balance test for three phase transformercbip manual, cl.7.3
power transformers (5 kva to 5 mva, 3-phase voltage class up to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)no load current at all adjustmentsis 2026 (part 1) iec60076-1, cl.10.6 power transformers (5 kva to 5 mva, 3-phase voltage class up to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)transformer oil dielectric test (bdv)is 6792
list of our services following cities
ambala |
bhiwani |
charki dadri |
faridabad |
fatehabad |
gurugram |
hisar |
jhajjar |
jind |
kaithal |
karnal |
kurukshetra |
mahendragarh |
nuh |
palwal |
panchkula |
panipat |
rewari |
rohtak |
sirsa |
sonipat |
yamunanagar |
bilaspur |
chamba |
hamirpur |
kangra |
kinnaur |
kullu |
lahul and spiti |
mandi |
shimla |
sirmaur |
solan |
una |
anantnag |
bandipora |
baramulla |
budgam |
doda |
ganderbal |
jsrinagar |
kathua |
kishtwar |
kulgam |
kupwara |
poonch |
pulwama |
kasaragod |
rajouri |
ramban |
reasi |
samba |
shopian |
srinagar |
udhampur |
bokaro |
chatra |
deoghar |
dhanbad |
dumka |
east singhbum |
garhwa |
giridih |
godda |
gumla |
hazaribagh |
jamtara |
khunti |
koderma |
latehar |
lohardaga |
pakur |
palamu |
ramgarh |
ranchi |
sahebganj |
saraikela kharsawan |
simdega |
west singhbhum |
agar malwa |
alirajpur |
anuppur |
ashoknagar |
balaghat |
barwani |
betul |
bhind |
bhopal |
burhanpur |
chhatarpur |
chhindwara |
damoh |
datia |
dewas |
dhar |
dindori |
east nimar |
guna |
gwalior |
harda |
hoshangabad |
indore |
jabalpur |
jhabua |
katni |
khargone |
mandla |
mandsaur |
morena |
narsinghpur |
neemuch |
niwari |
panna |
raisen |
rajgarh |
ratlam |
rewa |
sagar |
satna |
sehore |
seoni |
shahdol |
shajapur |
sheopur |
shivpuri |
sidhi |
singrauli |
tikamgarh |
ujjain |
umaria |
vidisha |
ariyalur |
chengalpattu |
chennai |
coimbatore |
cuddalore |
dharmapuri |
dindigul |
erode |
azamgarh |
kallakurichi |
kanchipuram |
kanniyakumari |
karur |
krishnagiri |
madurai |
mayiladuthurai |
nagapattinam |
namakkal |
perambalur |
pudukkottai |
ramanathapuram |
ranipet |
salem |
sivaganga |
tenkasi |
thanjavur |
theni |
the nilgiris |
thiruvallur |
thiruvarur |
tiruchirappalli |
tirunelveli |
tirupathur |
tiruppur |
tiruvannamalai |
tuticorin |
vellore |
villupuram |
virudhunagar |
nicobars |
north and middle andaman |
south andamans |
anantapur |
chittoor |
east godavari |
guntur |
krishna |
kurnool |
prakasam |
spsr nellore |
srikakulam |
visakhapatanam |
vizianagaram |
west godavari |
y.s.r. |
anjaw |
changlang |
dibang valley |
east kameng |
east siang |
kamle |
kra daadi |
kurung kumey |
leparada |
lohit |
longding |
lower dibang valley |
lower siang |
lower subansiri |
namsai |
pakke kessang |
papum pare |
shi yomi |
siang |
tawang |
tirap |
upper siang |
upper subansiri |
west kameng |
west siang |
baksa |
barpeta |
biswanath |
bongaigaon |
cachar |
charaideo |
chirang |
kannur |
darrang |
dhemaji |
dhubri |
dibrugarh |
dima hasao |
goalpara |
golaghat |
hailakandi |
hojai |
jorhat |
kamrup |
kamrup metro |
karbi anglong |
karimganj |
kokrajhar |
lakhimpur |
majuli |
marigaon |
nagaon |
nalbari |
sivasagar |
sonitpur |
south salmara mancachar |
tinsukia |
udalguri |
west karbi anglong |
araria |
arwal |
aurangabad |
banka |
begusarai |
bhagalpur |
bhojpur |
buxar |
darbhanga |
gaya |
gopalganj |
jamui |
jehanabad |
kaimur (bhabua) |
katihar |
khagaria |
kishanganj |
lakhisarai |
madhepura |
madhubani |
munger |
muzaffarpur |
nalanda |
nawada |
pashchim champaran |
patna |
purbi champaran |
purnia |
rohtas |
saharsa |
samastipur |
saran |
sheikhpura |
sheohar |
sitamarhi |
siwan |
supaul |
vaishali |
chandigarh |
balod |
baloda bazar |
balrampur |
bastar |
bemetara |
bijapur |
bilaspur |
dantewada |
dhamtari |
durg |
gariyaband |
gaurella pendra marwahi |
janjgir-champa |
jashpur |
kabirdham |
kanker |
kondagaon |
korba |
korea |
mahasamund |
mungeli |
narayanpur |
raigarh |
raipur |
rajnandgaon |
sukma |
surajpur |
surguja |
central delhi |
east delhi |
new delhi |
north delhi |
north east delhi |
north west delhi |
shahdara |
south delhi |
south east delhi |
south west delhi |
west delhi |
north goa |
south goa |
ahmadabad |
amreli |
anand |
arvalli |
banas kantha |
bharuch |
bhavnagar |
botad |
chhotaudepur |
dang |
devbhumi dwarka |
dohad |
gandhinagar |
gir somnath |
jamnagar |
junagadh |
kachchh |
kheda |
mahesana |
mahisagar |
morbi |
narmada |
navsari |
panch mahals |
patan |
porbandar |
rajkot |
sabar kantha |
surat |
surendranagar |
tapi |
vadodara |
valsad |
bagalkote |
ballari |
belagavi |
bengaluru rural |
bengaluru urban |
bidar |
chamarajanagara |
chikkaballapura |
chikkamagaluru |
chitradurga |
dakshina kannada |
davangere |
dharwad |
gadag |
hassan |
haveri |
kalaburagi |
kodagu |
kolar |
koppal |
mandya |
mysuru |
raichur |
ramanagara |
shivamogga |
tumakuru |
udupi |
uttara kannada |
vijayapura |
yadgir |
alappuzha |
ernakulam |
idukki |
kollam |
kottayam |
kozhikode |
malappuram |
palakkad |
pathanamthitta |
thiruvananthapuram |
thrissur |
wayanad |
kargil |
leh ladakh |
lakshadweep district |
ahmednagar |
akola |
amravati |
aurangabad |
beed |
bhandara |
buldhana |
chandrapur |
dhule |
gadchiroli |
gondia |
hingoli |
jalgaon |
jalna |
kolhapur |
latur |
mumbai |
mumbai suburban |
nagpur |
nanded |
nandurbar |
nashik |
osmanabad |
palghar |
parbhani |
pune |
raigad |
ratnagiri |
sangli |
satara |
sindhudurg |
solapur |
thane |
wardha |
washim |
yavatmal |
bishnupur |
chandel |
churachandpur |
imphal east |
imphal west |
jiribam |
kakching |
kamjong |
kangpokpi |
noney |
pherzawl |
senapati |
tamenglong |
tengnoupal |
thoubal |
ukhrul |
east garo hills |
east jaintia hills |
east khasi hills |
north garo hills |
ri bhoi |
south garo hills |
south west garo hills |
south west khasi hills |
west garo hills |
west jaintia hills |
west khasi hills |
aizawl |
gurdaspur |
champhai |
hnahthial |
khawzawl |
kolasib |
lawngtlai |
lunglei |
mamit |
saiha |
saitual |
serchhip |
dimapur |
kiphire |
kohima |
longleng |
mokokchung |
mon |
noklak |
peren |
phek |
tuensang |
wokha |
zunheboto |
anugul |
balangir |
baleshwar |
bargarh |
bhadrak |
boudh |
cuttack |
deogarh |
dhenkanal |
gajapati |
ganjam |
jagatsinghapur |
jajapur |
jharsuguda |
kalahandi |
kandhamal |
kendrapara |
kendujhar |
khordha |
koraput |
malkangiri |
mayurbhanj |
nabarangpur |
nayagarh |
nuapada |
puri |
rayagada |
sambalpur |
sonepur |
sundargarh |
karaikal |
mahe |
pondicherry |
yanam |
amritsar |
barnala |
bathinda |
faridkot |
fatehgarh sahib |
fazilka |
firozepur |
hoshiarpur |
jalandhar |
kapurthala |
ludhiana |
mansa |
moga |
pathankot |
patiala |
rupnagar |
sangrur |
s.a.s nagar |
shahid bhagat singh nagar |
sri muktsar sahib |
tarn taran |
ajmer |
alwar |
banswara |
baran |
barmer |
bharatpur |
bhilwara |
bikaner |
bundi |
chittorgarh |
churu |
dausa |
dholpur |
dungarpur |
ganganagar |
hanumangarh |
jaipur |
jaisalmer |
jalore |
jhalawar |
jhunjhunu |
jodhpur |
karauli |
kota |
nagaur |
pali |
pratapgarh |
rajsamand |
sawai madhopur |
sikar |
sirohi |
tonk |
udaipur |
east district |
north district |
south district |
west district |
adilabad |
bhadradri kothagudem |
hyderabad |
jagitial |
jangoan |
jayashankar bhupalapally |
jogulamba gadwal |
kamareddy |
karimnagar |
khammam |
kumuram bheem asifabad |
mahabubabad |
mahabubnagar |
mancherial |
medak |
medchal malkajgiri |
baghpat |
mulugu |
nagarkurnool |
nalgonda |
narayanpet |
nirmal |
nizamabad |
peddapalli |
rajanna sircilla |
ranga reddy |
sangareddy |
siddipet |
suryapet |
vikarabad |
wanaparthy |
warangal rural |
warangal urban |
yadadri bhuvanagiri |
dadra and nagar haveli |
daman |
diu |
dhalai |
gomati |
khowai |
north tripura |
sepahijala |
south tripura |
unakoti |
west tripura |
almora |
bageshwar |
chamoli |
champawat |
dehradun |
haridwar |
nainital |
pauri garhwal |
pithoragarh |
rudra prayag |
tehri garhwal |
udam singh nagar |
uttar kashi |
agra |
aligarh |
ambedkar nagar |
amethi |
amroha |
auraiya |
ayodhya |
bahraich |
ballia |
balrampur |
banda |
barabanki |
bareilly |
basti |
bhadohi |
bijnor |
budaun |
bulandshahr |
chandauli |
chitrakoot |
deoria |
etah |
etawah |
farrukhabad |
fatehpur |
firozabad |
gautam buddha nagar |
ghaziabad |
ghazipur |
gonda |
gorakhpur |
hamirpur |
hapur |
hardoi |
hathras |
jalaun |
jaunpur |
jhansi |
kannauj |
kanpur dehat |
kanpur nagar |
kasganj |
kaushambi |
kheri |
kushi nagar |
lalitpur |
lucknow |
maharajganj |
mahoba |
mainpuri |
mathura |
mau |
meerut |
mirzapur |
moradabad |
muzaffarnagar |
pilibhit |
pratapgarh |
prayagraj |
rae bareli |
rampur |
saharanpur |
sambhal |
sant kabeer nagar |
shahjahanpur |
shamli |
shravasti |
siddharth nagar |
sitapur |
sonbhadra |
sultanpur |
unnao |
varanasi |
24 paraganas north |
24 paraganas south |
alipurduar |
bankura |
birbhum |
coochbehar |
darjeeling |
dinajpur dakshin |
dinajpur uttar |
hooghly |
howrah |
jalpaiguri |
jhargram |
kalimpong |
kolkata |
maldah |
medinipur east |
medinipur west |
murshidabad |
nadia |
paschim bardhaman |
purba bardhaman |
purulia ...
list of our services following states
andaman and nicobar islands |
andhra pradesh |
arunachal pradesh |
assam |
bihar |
chandigarh |
chhattisgarh |
delhi |
goa |
gujarat |
haryana |
himachal pradesh |
jsrinagar and kashmir |
jharkhand |
karnataka |
kerala |
ladakh |
lakshadweep |
madhya pradesh |
maharashtra |
manipur |
meghalaya |
mizoram |
nagaland |
odisha |
puducherry |
punjab |
rajasthan |
sikkim |
tamil nadu |
telangana |
the dadra and nagar haveli and daman and diu |
tripura |
uttarakhand |
uttar pradesh |
west bengal ...
list of our services following districts
alipur |
chanakya puri |
civil lines |
defence colony |
delhi cantonment |
dwarka |
gandhi nagar |
hauz khas |
kalkaji |
kanjhawala |
kapeshera |
karawal nagar |
karol bagh |
kotwali |
mayur vihar |
mehrauli |
model town |
najafgarh |
narela |
patel nagar |
preet vihar |
punjabi bagh |
rajouri garden |
rohini |
saket |
saraswati vihar |
sarita vihar |
seelam pur |
seema puri |
shahdara |
vasant vihar |
vivek vihar |
yamuna vihar |
adampur |
alewa |
ambala |
ambala cantonment |
assandh |
ateli |
babain st |
badhra |
badkhal |
badli |
badshahpur st |
bahadurgarh |
bahal st |
bahin st |
ballabgarh |
ballah st |
balsamand st |
bapoli |
barara |
barwala |
barwala st |
bass |
bawal |
bawani khera |
beri |
bhattukalan st |
bhiwani |
bhuna st |
bilaspur |
bondkalan st |
chhachhrauli |
dabwali |
dadri |
dahina st |
dayalpur st |
dhand st |
dharuhera st |
dhauj st |
ellenabad |
faridabad |
farrukhnagar |
fatehabad |
fatehpur pundri |
ferozepur jhirka |
ganaur |
gaunchi st |
gharaunda |
gohana |
goriwala st |
guhla |
gurgaon |
hansi |
harsaru st |
hassanpur st |
hathin |
hisar |
hodal |
indri |
ismailabad st |
israna |
jagadhri |
jakhal st |
jhajjar |
jind |
julana |
kadipur st |
kaithal |
kalanaur |
kalanwali |
kalayat |
kalka |
kanina |
karnal |
khanpur st |
kharkhoda |
kheri jalab st |
khizrabad st |
kosli |
kulan st |
ladwa |
lakhan majra st |
loharu |
maham |
mahendragarh |
manesar |
manethi st |
matenhail |
matlauda |
mohna st |
morni st |
mulana st |
nagina st |
nahar st |
nangal chawdhary |
naraingarh |
narnaul |
narnaund |
narwana |
nathusari chopta |
nigdu st |
nilokheri |
nising st |
nuh |
palhawas st |
palwal |
panchkula |
panipat |
pataudi |
pehowa |
pillukhera st |
punahana |
radaur |
raipur rani |
rai st |
rajaund st |
rania |
ratia |
rewari |
rohtak |
sadhaura st |
safidon |
saha st |
salhawas st |
samalkha |
sampla |
saraswati nagar st |
satnali st |
shahbad |
shahzadpur st |
sirsa |
siwani |
siwan st |
sohna |
sonipat |
taoru |
thanesar |
tigaon st |
tohana |
tosham |
uchana |
uklana st |
wazirabad st |
abohar |
ahmedgarh |
ajnala |
amloh |
amritsar -i |
amritsar- ii |
anandpur sahib |
baba bakala |
bagha purana |
balachaur |
banga |
barnala |
bassi pathana |
batala |
bathinda |
bhawanigarh |
bhikhiwind |
bhulath |
budhlada |
chamkaur sahib |
dasua |
dera baba nanak |
dera bassi |
dharamkot |
dhar kalan |
dhuri |
dinanagar |
dirba |
dudhan sadhan |
faridkot |
fatehgarh sahib |
fazilka |
firozpur |
garhshankar |
gidderbaha |
gurdaspur |
guruharsahai |
hoshiarpur |
jagraon |
jaitu |
jalalabad |
jalandhar - i |
jalandhar - ii |
kalanaur |
kapurthala |
khadur sahib |
khamanon |
khanna |
kharar |
kotakpura |
lehra |
ludhiana (east) |
ludhiana (west) |
majitha |
malerkotla |
malout |
mamdot |
mansa |
maur |
moga |
moonak |
morinda |
mukerian |
muktsar |
nabha |
nakodar |
nangal |
nawanshahr |
nihal singhwala |
pathankot |
patiala |
patran |
patti |
payal |
phagwara |
phillaur |
raikot |
rajpura |
rampura phul |
rup nagar |
samana |
samrala |
sangrur |
sardulgarh |
sas nagar (mohali) |
shahkot |
sultanpur lodhi |
sunam |
talwandi sabo |
tapa |
tarn taran |
zira...
list of our services following districts
alampur
amb |
ani |
arki |
aut |
baddi |
bagachnogi |
baijnath |
baldwara |
balh |
bali chowki |
bangana |
banjar |
baroh |
barsar |
bhadrota |
bhalai |
bharari |
bharmour |
bharwain |
bhattiyat |
bhawarna |
bhoranj |
bhota |
bhuntar |
bilaspur sadar |
birhu kalan |
chachyot |
chadiyar |
chamba |
chaupal |
chhatri |
chirgaon |
churah |
dadahu |
dadasiba |
dalhousie |
dareeni |
darlaghat |
deha |
dehar |
dera gopipur |
dhami |
dharmpur |
dharmsala |
dharwala |
dhatwal |
dhira |
dodra kwar |
dulahar |
fatehpur |
gagret |
galore |
gangath |
ghanari |
ghumarwin |
hamirpur |
hangrang |
harchakian |
haripur |
haripurdhar |
haroli |
holi |
indora |
ispur |
jaisinghpur |
jalog |
jangla |
jaswan |
jawalamukhi |
jawali |
jhanduta |
jogindarnagar |
jol |
jubbal |
junga |
kakira |
kalol |
kalpa |
kamrau |
kandaghat |
kangoo |
kangra |
karsog |
kasauli |
katoula |
khundian |
kotgarh |
kotkhai |
kotla |
kotli |
krishangarh |
kullu |
kumarsain |
kunihar |
kupvi |
lad bharol |
lagru |
lahul |
majheen |
makridi |
mamlig |
manali |
mandap |
mandi |
mehatpur |
morang |
multhan |
nadaun |
nagrota bagwan |
nagrota surian |
nahan |
naina devi |
nalagarh |
namhol |
nankhari |
narag |
nerwa |
nichar |
nihri |
nirmand |
nither |
nohra |
nurpur |
pachhad |
padhar |
pajhota |
palampur |
panchrukhi |
pangi |
pangna |
panjehra |
paonta sahib |
poo |
pragpur |
pukhri |
rajgarh |
rakkar |
rampur |
ramshahr |
renuka |
rewalsar |
rohru |
ronhat |
sainj |
saluni |
sandhol |
sangla |
sarahan |
sarawati nagar |
sarkaghat |
shahpur |
shalai |
shimla ( rural ) |
shimla (urban) |
sihunta |
solan |
spiti |
sulah |
sundarnagar |
sunni |
taklech |
tapri |
tauni devi bamson |
theog |
thunag |
thural |
tihra |
tikar |
tikken |
tira sujanpur |
udaipur |
una |
ajas |
akhnoor |
aloosa |
anantnag |
anantnag east |
aripal |
arnas |
arnia |
assar |
atholi (paddar) |
awantipora |
bahu |
balakote |
bandipora |
bani |
banihal |
baramulla |
barbugh |
bari brahamana |
basantgarh |
basohli |
batote |
beerwah |
beri pattan |
bhaderwah |
bhagwah |
bhalessa |
bhalla |
bhalwal |
bharath bagla |
bhomag |
bijbehara |
billawar |
bishnah |
bk pora |
boniyar |
bounjwah |
budgam |
chadoora |
channapora |
charar- e- shrief |
chassana |
chenani |
chhatroo |
chilly pingal |
chiralla |
chitragam |
chowki choura |
dachhan |
dangarpora |
danghiwacha |
dansal |
darhal |
devsar |
d h pora |
dinga amb |
doda |
dooru |
drabshalla |
drugmulla |
eidgah |
frisal |
ganderbal |
ghagwal |
gool |
gund |
gundna |
gurez |
hajin |
handwara |
haveli |
hermain |
hiranagar |
jsrinagar |
jsrinagar north |
jsrinagar south |
jsrinagar west |
jourian |
kahara |
kakapora |
kalakote |
kangan |
karnah |
kashtigarh |
kathua |
katra |
kawarhama |
keegam |
keller |
keran |
khag |
khansahib |
khanyar |
kharah balli |
khari |
khawas |
khoie |
khour |
kishtwar |
kokernag |
koteranka |
kralpora |
kreeri |
kulgam |
kunzar |
kupwara |
lalpora |
langate |
lar |
larnoo |
laroka |
latti |
lohai malhar |
lolab |
machail |
machil |
magam |
mahanpur |
mahore |
maira mandrian |
majalta |
mandal |
mandi |
manjakote |
mankote |
marh |
marheen |
marmat |
marwah |
mendhar |
mohalla |
moungri |
mughalmaidan |
nagri |
nagrota |
nagseni |
narbal |
nowshera |
pahalgam |
pahloo |
pampore |
panchari |
panthachowk |
pargwal |
pattan |
phigsoo |
pogal paristan |
pouni |
pulwama |
qaimoh |
qaziabad |
qazigund |
qila darhal |
rafiabad |
rajgarh |
rajouri |
rajpora |
rajpura |
ramban |
ramgarh |
ramhal |
ramkote |
ramnagar |
ranbir singh pura |
reasi |
sallar |
samba |
shahbad bala |
shahoora |
shangus |
shopian |
siot |
sonawari |
sopore |
srigufwara |
srinagar central |
srinagar (north) |
srinagar (south) |
suchetgarh |
sundarbani |
surankote |
tangmarg |
taryath |
thakrakote |
thana mandi |
thathri |
thuroo |
tral |
trehgam |
tulail |
tullamulla khirbhawani |
udhampur |
uri |
vijaypur |
wagoora |
wakoora |
warwan |
watergam |
yaripora |
zachaldara |
zainapora |
zaingeer |
277 chandigarh |
adibadri |
almora |
bageshwar |
bagwalipokhar |
bajpur |
balganga |
bangapani |
barakot |
barnigad |
basukedar |
berinag |
betalghat |
bhagwanpur |
bhanoli |
bhatwari |
bhikiasain |
bironkhal |
chakisain |
chakrata |
chamoli |
champawat |
chaubatta khal |
chaukhutiya |
chinyali saur |
dehradun |
devalthal |
devprayag |
dewal |
dhanaulti |
dharchula |
dhari |
dhaulchhina |
dhauntari |
dhoomakot |
dhyari |
didihat |
doiwala |
dugnakuri |
dunda |
dwarahat |
gadarpur |
gairsain |
gaja |
ganai gangoli |
gangolihat |
garud |
ghaat |
ghansali |
haldwani |
hardwar |
jainti |
jakhani dhar |
jakhanikhal |
jakholi |
jalali |
jaspur |
jilasu |
joshimath |
joshiyara |
kafligair |
kaladhungi |
kalsi |
kanalichhina |
kanda |
kandisaur |
kapkot |
karnaprayag |
kashipur |
khatima |
kichha |
kirtinagar |
kosya kutauli |
kotdwara |
laksar |
laldhang |
lalkuan |
lamgada |
lansdowne |
lohaghat |
machhor |
madannegi |
manch |
mori |
munsiari |
nainbag |
nainital |
nanakmatta |
nandprayag |
narayanbagar |
narendra nagar |
narsan |
okhalkanda |
pankhu |
pati |
pauri |
pawkidevi |
pithoragarh |
pokhari |
poornagiri |
pratapnagar |
pulla gumdesh |
puraula |
rajgarhi |
ramgarh |
ramnagar |
ranikhet |
rikhanikhal |
rishikesh |
roorkee |
rudraprayag |
rudrapur |
sankari |
satpuli |
shama |
sitarganj |
someshwar |
srinagar |
sult |
syalde |
tehri |
tejam |
thailisain |
thal |
tharali |
tyuni |
ukhimath |
vikas nagar |
yamkeshwar |
drass |
kargil |
khalsi |
leh |
nubra |
sanku |
shaker chiktan |
zanskar...
list of our services following countries
India |
China |
United States |
Indonesia |
Pakistan |
Brazil |
Nigeria |
Bangladesh |
Russia |
Mexico |
Japan |
Ethiopia |
Philippines |
Egypt |
Vietnam |
DR Congo |
Turkey |
Iran |
Germany |
Thailand |
United Kingdom |
France |
Italy |
Tanzania |
South Africa |
Myanmar |
Kenya |
South Korea |
Colombia |
Spain |
Uganda |
Argentina |
Algeria |
Sudan |
Ukraine |
Iraq |
Afghanistan |
Poland |
Canada |
Morocco |
Saudi Arabia |
Uzbekistan |
Peru |
Angola |
Malaysia |
Mozambique |
Ghana |
Yemen |
Nepal |
Venezuela |
Madagascar |
Cameroon |
Côte d'Ivoire |
North Korea |
Australia |
Niger |
Sri Lanka |
Burkina Faso |
Mali |
Romania |
Malawi |
Chile |
Kazakhstan |
Zambia |
Guatemala |
Ecuador |
Syria |
Netherlands |
Senegal |
Cambodia |
Chad |
Somalia |
Zimbabwe |
Guinea |
Rwanda |
Benin |
Burundi |
Tunisia |
Bolivia |
Belgium |
Haiti |
Cuba |
South Sudan |
Dominican Republic |
Czech Republic |
Greece |
Jordan |
Portugal |
Azerbaijan |
Sweden |
Honduras |
United Arab Emirates |
Hungary |
Tajikistan |
Belarus |
Austria |
Papua New Guinea |
Serbia |
Israel |
Switzerland |
Togo |
Sierra Leone |
Laos |
Paraguay |
Bulgaria |
Libya |
Lebanon |
Nicaragua |
Kyrgyzstan |
El Salvador |
Turkmenistan |
Singapore |
Denmark |
Finland |
Congo |
Slovakia |
Norway |
Oman |
State of Palestine |
Costa Rica |
Liberia |
Ireland |
Central African Republic |
New Zealand |
Mauritania |
Panama |
Kuwait |
Croatia |
Moldova |
Georgia |
Eritrea |
Uruguay |
Bosnia and Herzegovina |
Mongolia |
Armenia |
Jamaica |
Qatar |
Albania |
Lithuania |
Namibia |
Gambia |
Botswana |
Gabon |
Lesotho |
North Macedonia |
Slovenia |
Guinea-Bissau |
Latvia |
Bahrain |
Equatorial Guinea |
Trinidad and Tobago |
Estonia |
Timor-Leste |
Mauritius |
Cyprus |
Eswatini |
Djibouti |
Fiji |
Comoros |
Guyana |
Bhutan |
Solomon Islands |
Montenegro |
Luxembourg |
Suriname |
Cabo Verde |
Micronesia |
Maldives |
Malta |
Brunei |
Belize |
Bahamas |
Iceland |
Vanuatu |
Barbados |
Sao Tome & Principe |
Samoa |
Saint Lucia |
Kiribati |
Grenada |
St. Vincent & Grenadines |
Tonga |
Seychelles |
Antigua and Barbuda |
Andorra |
Dominica |
Marshall Islands |
Saint Kitts & Nevis |
Monaco |
Liechtenstein |
San Marino |
Palau |
Tuvalu |
Nauru |
Holy See ...