primary battery1.5 v metal clad dry battery (r6 – no. 1,r14– no. 3, r 20– no. 6) testing lab in meghalayadimension(length and diameter) testing lab in meghalayajss 6135-01:2013 (revision no. 2) clause no. 16.2 standard testing lab in meghalaya
primary battery1.5 v metal clad dry battery (r6 – no. 1,r14– no. 3, r 20– no. 6) testing lab in meghalayaweight testing lab in meghalayajss 6135-01:2013 (revision no. 2) clause no. 16.3 standard testing lab in meghalaya
primary battery1.5 v metal clad dry battery (r6 – no. 1,r14– no. 3, r 20– no. 6) testing lab in meghalaya3. open circuit voltage testing lab in meghalayajss 6135-01:2013 (revision no. 2) clause no. 16.5 standard testing lab in meghalaya
secondary batteryni–cd portable sealed cylindrical alkaline12 v, 4 ah testing lab in meghalayadimension testing lab in meghalayajss 6140-03:2013 (revision no. 4) clause no. 9.10.1, supplement no. 12, clause no. 3.6 standard testing lab in meghalaya
secondary batteryni–cd portable sealed cylindrical alkaline12 v, 4 ah testing lab in meghalayaweight testing lab in meghalayajss 6140-03:2013 (revision no. 4) clause no. 9.10.4, supplement no. 12 clause no. 3.7 standard testing lab in meghalaya
secondary batteryni–cd portable sealed cylindrical alkaline12 v, 4 ah testing lab in meghalayacapacity test at room temperature testing lab in meghalayajss 6140-03: 2013 (revision no. 4) clause no. 9.10.5.1supplement no. 12 (clause no 4.1) standard testing lab in meghalaya
power cable (elastomer) testing lab in meghalayadimensions testing lab in meghalayais 9968 (part 1): 2010is 10810: 1984 (ra 2016) standard testing lab in meghalaya
power cable (elastomer) testing lab in meghalayaconductor resistance testing lab in meghalayais 10810 (part 5): 1984 (ra 2016) standard testing lab in meghalaya
power cable (elastomer) testing lab in meghalayainsulation resistance testing lab in meghalayais 10810 (part 43): 1984 (ra 2016) standard testing lab in meghalaya
power cable (elastomer) testing lab in meghalayahigh voltage testing lab in meghalayais 10810 (part 45): 1984 (ra 2016) standard testing lab in meghalaya
power cable (elastomer) testing lab in meghalayatensile strengthelongation at break testing lab in meghalayais 10810 (part 7): 1984 (ra 2016) standard testing lab in meghalaya
power cable (pvc) testing lab in meghalayadimensions testing lab in meghalayais 694:2010, is 10810:1984 (ra 2016)is 5831: 1984 (ra 2016) standard testing lab in meghalaya
power cable (pvc) testing lab in meghalayaconductor resistance testing lab in meghalayais 10810 (part 5): 1984 (ra 2016) standard testing lab in meghalaya
power cable (pvc) testing lab in meghalayainsulation resistance testing lab in meghalayais 10810 (part 43): 1984 (ra 2016) standard testing lab in meghalaya
power cable (pvc) testing lab in meghalayahigh voltage testing lab in meghalayais 10810 (part 45): 1984 (ra 2016) standard testing lab in meghalaya
power cable (pvc) testing lab in meghalayatensile strengthelongation at break testing lab in meghalayais 10810 (part 7): 1984 (ra 2016) standard testing lab in meghalaya
power cable (pvc) testing lab in meghalayaheat shock testing lab in meghalayais 10810 (part 14): 1984 (ra 2016) standard testing lab in meghalaya
power cable (pvc) testing lab in meghalayashrinkage testing lab in meghalayais 10810 (part 12): 1984 (ra 2016) standard testing lab in meghalaya
power cable (pvc) testing lab in meghalayacold bend testing lab in meghalayais 10810 (part 20): 1984 (ra 2016) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayahigh temperature testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 17) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayatemperature (dry heat) testing lab in meghalayajss 50101: 1996 (rev. 01)(test no. 22) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayadry heat testing lab in meghalayais 9000 (part 3): 1977 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayalow temperature testing lab in meghalayajss 55555:2012 (rev- 03)(test no. 20) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayatemperature (cold) testing lab in meghalayajss 50101: 1996 (rev. 01)(test no. 21) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayacold test testing lab in meghalayais 9000 (part 2): 1977 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayadamp heat testing lab in meghalayajss 55555:2012 (rev. 03) (test no. 10) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayasteady state damp heat testing lab in meghalayajss 50101: 1996 (rev. 01) (test no.07)is 9000 (part 4): 2008 standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayacyclic damp heat testing lab in meghalayajss 50101: 1996 (rev. 01) (test no. 05) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayadamp heat(moisture resistance) testing lab in meghalayajss 50101: 1996 (rev.01)(test no. 06) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayacyclic test (composite temperature / humidity) testing lab in meghalayais 9000 (part 6): 1978 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayasolar radiation testing lab in meghalayajss 55555: 2012 (rev.03)(test no. 25) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayaradiation testing lab in meghalayais 9000 (part 17): 1985 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayadust testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 14) is 9000 (part 12): 1981 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayaaltitude testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 3) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayacombined cold / low air pressure testing lab in meghalayais 9000 (part 31): 1985 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayaaltitude-low air pressure testing lab in meghalayajss 50101: 1996 (rev. 01)(test no.2) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayalow air pressure testing lab in meghalayais 9000 (part 13): 1981 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayadriving rain testing lab in meghalayajss 55555: 2012 (rev. 03)(test no.12) is 9000 (part 16): 1983 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayarapid temperature cycling (thermal shock) testing lab in meghalayajss 55555:2012 (rev-03)(test no.22) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayatemperature cycling testing lab in meghalayajss 50101: 1996 (rev. 01)(test no-20) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayachange of temperature testing lab in meghalayais 9000 (part 14): 1988 (ra 2015) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayacorrosion (salt / salt fog) testing lab in meghalayajss 55555: 2012 (rev. 03) (test no.9) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayacorrosive atmosphere(salt mist) testing lab in meghalayajss 50101: 1996 (rev. 01)(test no-4) is 9000 (part 11):1983 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayamould growth test testing lab in meghalayajss 55555: 2000 (rev. 02)(test no. 21) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayamould growth testing lab in meghalayajss 50101: 1996 (rev. 01)(test no.14) is 9000 (part 10): 1979 (ra 2010) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayacontamination test testing lab in meghalayajss 55555: 2012 (rev. 03) (test no. 06) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayatropical exposure testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 27) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayadesert storage testing lab in meghalayajss 6135–01: 2013 (rev. 02) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajungle storage testing lab in meghalayajss 6135–01: 2013 (rev. 02) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayavibration testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 28)jss standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 28)jss standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 28)jss standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 28)jss standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 28)jss standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 28)jss standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 28)jss standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 28)jss standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 28) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 50101: 1996 (rev. 01) (test no. 24 ) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayais 14257: 1995 (ra 2011) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayais 14257: 1995 (ra 2011) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayais 14257: 1995 (ra 2011) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayabump testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 05) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 50101: 1996 (rev. 01)(test no.11) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayais 9000 (part 7): 2006 standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayashock testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 24) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayajss 50101: 1996 (rev. 01)(test no. 12) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayais 9000 (part 7/ sec. 1): 2006 standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayabounce testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 4) (procedure 1) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayais 9000 (part 7 / sec. vi):1988clause no. 5.6.1.2 (ra 2015) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayadrop test testing lab in meghalayajss 55555: 2012 (rev. 03)(test no. 13) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayais 9000 (part-7): 1979 (ra 2006) standard testing lab in meghalaya
electronic and electrical equipment & component testing lab in meghalayatoppling test testing lab in meghalayajss 55555: 2012 (rev. 03)(test no.26) standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainfluence quntities- voltage variation- frequency variation- phase sequence- voltage unbalance- wave form testing lab in meghalayacl. no. 4.6.2 of is 15884: 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainfluence quntities- voltage variation- frequency variation- phase sequence- voltage unbalance- wave form testing lab in meghalayacl. no. 6.12 of is 16444: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainfluence quntities- voltage variation- frequency variation- phase sequence- voltage unbalance- wave form testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainfluence quntities- voltage variation- frequency variation- phase sequence- voltage unbalance- wave form testing lab in meghalayacl. no. 5 of nmi m 6- 1:july: 2012 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainsulation resistance testing lab in meghalayacl. no. 5.4.6.4 of cbip publication : 325 january : 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainsulation resistance testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainsulation resistance testing lab in meghalayacl. no. 6.10.6 of is 16444(part 2): 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainsulation resistance testing lab in meghalayacl. no. 6.10.6 of is 16444: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainsulation resistance testing lab in meghalayacl. no. 5.4.6.4 of cbip publication no. :304: 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainsulation resistance testing lab in meghalayacl. no. 12.7.6.4 of is 14697 amd 1 to 4: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainsulation resistance testing lab in meghalayacl. no. 5.4.6.4 of is 15884: 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 8.6 of iec 62053-23 : 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 8.6 of iec 62053-22: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 8.7 of iec 62053-24: 2014 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 5.6.6 of is 15884 : 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 12.16 of is 13779 amd. 1 to 5: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 5.6.7 of cbip publication: 304: 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 6.12 of is 16444: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 12.15 of is 14697 amd. 1 to 4: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 5.6.7 of cbip publication no.: 325 january : 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 8.6 of iec 62053-21: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayaiec: 62052-11: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 8 of iec 62055- 31: 2005 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainterpretation of test results and adjustments testing lab in meghalayacl. no. 6.12 of is 16444(part 2) : 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. no. 3.3 of oiml r 46-1 and 2:12 auguest: 2011 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. no. 8 of iec 62055- 31: 2005 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. no. 6.12 of is 16444(part 2) : 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. 4.6.1 of is 15884: 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. 6.12 of is 16444: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. no. 8.1 of iec 62053-23: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. 8.1 of iec 62053- 21: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. 4.6.3 of cbip publication: 304: 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. no. 8.2 of iec 62053-24 : 2014 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. no. 4.8 of nmi m 6- 1:july : 2012 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. 11.1 of is 13779 amd: 1 to 5: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. no. 8.1 of iec 62053-22: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. 11.1 of is 14697 amd: 1 to 4: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayaiec 62052-11 : 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayalimits of errors / accuracy requirement testing lab in meghalayacl. 4.6.2 of cbip publication no.: 325 january : 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 8.5 of iec 62053-24: 2014 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 5.6.5 of is 15884: 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 4.6 of nmi m 6- 1:july: 2012 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 6.12 of is 16444: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 6.2.5 of oiml r 46-1 and 2: 12 auguest: 2011 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 8 of iec 62055- 31 : 2005 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. 8.4 of iec 62053- 23: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 8.4 of iec 62053-22: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 6.12 of is 16444(part 2) : 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayaiec: 62052-11 : 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 8.4 of iec 62053-21: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 12.15 of is 13779 amd.1 to 5: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 12.14 of is 14697 amd 1 to 4: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 5.6.6 of cbip publication no.: 325 , january: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayameter constant testing lab in meghalayacl. no. 5.6.6 of cbip publication: 304: 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarepeatability of errors test testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarepeatability of errors test testing lab in meghalayacl. no. 6.12 of is 16444: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarepeatability of errors test testing lab in meghalayacl. no. 6.12 of is 16444(part 2): 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarepeatability of errors test testing lab in meghalayacl. no. 5.6.7 of is 15884: 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarepeatability of errors test testing lab in meghalayacl. no. 5.6.9 of cbip publication no.: 325 , january : 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarepeatability of errors test testing lab in meghalayacl. no. 5.6.9 of cbip publication: 304 : 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 8.3 of iec 62053-22: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 8.3 of iec 62053-21: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayaiec: 62052-11: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 5.6.4 of cbip publication: 304 : 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 6.2.4 of oiml r 46-1 and 2:12 august: 2011 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 5.6.4 of cbip publication no.: 325 , january : 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 6.12 of is 16444: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 8.3 of iec 62053-23: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 12.13 of is 13779 amd. 1 to 5: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 8 of iec 62055- 31: 2005 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 5.7 of nmi m 6- 1:july: 2012 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 5.6.3 of is 15884 : 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 12.12 of is 14697 amd. 1 to 4: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 8.4 of iec 62053-24: 2014 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayarunning with no load / no- load condition testing lab in meghalayacl. no. 6.12 of is 16444(part 2): 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayaiec: 62052-11 : 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 5.6.5 of cbip publication: 304: 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 8.3 of iec 62053-23: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 5.7 of nmi m 6- 1:july: 2012 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 12.13 of is 14697 amd. 1 to 4: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 8 of iec 62055- 31: 2005 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 8.3 of iec 62053-21: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 6.2.3 of oiml r 46-1 and 2:12 august : 2011 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 5.6.5 of cbip publication no.: 325 , january : 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 8.3 of iec 62053-22: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 8.4 of iec 62053-24: 2014 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 6.12 of is 16444(part 2) : 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayastarting conditions, start up testing lab in meghalayacl. no. 6.12 of is 16444: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayaiec 62052-11: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.2 of iec 62053-24: 2014 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.3 of 62055- 31: 2005 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.2 of iec 62053-24: 2014 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 5.4.1 of is 15884: 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayaiec 62052-11: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 5.4.1 of cbip publication no. : 325 january: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 12.7.1 of is 14697 amd. 1 to 4: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 5.4.1 of cbip publication no. : 325 january: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 6.10.1 of is 16444: 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 6.10.1 of is 16444(part 2): 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.1 of iec 62053-22: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.1 of iec 62053-21: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.1 of iec 62053-23: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.3 of iec 62055-31: 2005 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.1 of iec 62053-23: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 12.7.1 of is 14697 amd. 1 to 4: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 12.7.1 of is 13779 amd. 1 to 5: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.1 of iec: 62053-22: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 12.7.1 of is 13779 amd. 1 to 5: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 7.1 of iec: 62053-21: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 5.4.1 of is 15884: 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 5.4.1 of cbip publication no. 304: 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 5.4.1 of cbip publication no. : 304: 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 6.10.1 of is 16444 (part 2): 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayatest of power consumption / power loss testing lab in meghalayacl. no. 6.10.1 of is 16444: 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 5.12 of iec: 62052-11 : 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 5.13 of iec 62055-31: 2005 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayais 15707: 2006 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 3.5 of oiml r 46-1 and 2:12 august : 2011 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayaiec 62053-21: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 8 of nmi m 6-1: july: 2012 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 4.2.2.11 of cbip publication no.: 325 , january : 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 6.8 of is 16444 (part 2) : 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayaiec 62053-22: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayaiec 62053-23: 2003 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 4.2.2.11 of cbip publication: 304: 2008 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 6.8 of is 16444 : 2015 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 7 of is 13779 amd. 1 ot 5: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 4.2.11 of is 15884: 2010 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayacl. no. 7 of is 14697 amd. 1 to 4: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayaverification of marking testing lab in meghalayaiec 62053-24: 2014 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments with its ct pt unit testing lab in meghalayatamper testing testing lab in meghalayaderc supply codes and performance standards regulations, 2017; proc t- 34:2018; cl. no. 6.2, 6.3, 6.4 & 6.5 & cl. 11.1 is 13779:1999 amd. 1 to 5; cl. no. 6.2, 6.3, 6.4 & 6.5, cl. 11.1, annexure g, g- 10 of is 14697:1999 amd. 1 to 4; is 15707:2006; nmi m 6- 1:july 2012; cl. no. 4.2.2, 4.2.3, 4.2.4 & 4.2.5 of is 15884:2010; cl. no. 6.2, 6.12 of is 16444:2015; cl. no. 6.2, 6.12 of is 16444 (part 2): 2017: 2017 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff and load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayadielectric strength or ac high voltage testing lab in meghalayacl. 12.7.6.3 of is 13779 amd. 1 to 5: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff and load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainsulation resistance( 500v dc ) testing lab in meghalayacl. no. 12.7.6.4 of is 13779 amd 1 to 5: 1999 standard testing lab in meghalaya
electrical- electrical indicating & recording instruments laboratory in meghalayaelectrical and electronic (static) energy meterselectrical and electronic (static) energy meters, prepayment meters, smart meters and tariff & load control equipment, electrical/electronic equipment, electrical & electronic multi- function measuring instruments testing lab in meghalayainfluence quntities- voltage variation- frequency variation- phase sequence- voltage unbalance- wave form testing lab in meghalayacl. no. 8.2 of iec 62053-21: 2003 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaacoustic source level (1khz to 100khz) testing lab in meghalayaatf-qp-7200-2: 2000 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaconductance (1 khz to 500 khz) testing lab in meghalayaatf-qp-7200-2: 2000 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayadirectivity (1 khz to100 khz) testing lab in meghalayaansi / asa s1.20: 2012 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaelectrical power output (1khz to 25khz) testing lab in meghalayaansi / asa s1.20: 2012 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaphase (1 khz to 500 khz) testing lab in meghalayaatf-qp-7200-2: 2000 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayareceiving sensitivity - free field comparison calibration (1 khz to 10 khz ) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayareceiving sensitivity- free field comparison calibration (>100 khz to 500 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayareceiving sensitivity- free field comparison calibration (>10khz to 100 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayasusceptance (1 khz to 500 khz) testing lab in meghalayaatf-qp-7200-2: 2000 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayatransmitting voltage response - free field comparison calibration (1 khz to 10 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayatransmitting voltage response - free field comparison calibration (>10 khz to 100 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayatransmitting voltage response -free field comparison calibration (>100 khz to 500 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaimpedance (1 khz to 500 khz) testing lab in meghalayaansi / asa s1.20: 2012 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaacoustic source level (1khz to 100khz) testing lab in meghalayaatf-qp-7200-2: 2000 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaconductance (1 khz to 500 khz) testing lab in meghalayaatf-qp-7200-2: 2000 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayadirectivity (1 khz to100 khz) testing lab in meghalayaansi / asa s1.20: 2012 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaelectrical power output (1khz to 25khz) testing lab in meghalayaansi / asa s1.20: 2012 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaphase (1 khz to 500 khz) testing lab in meghalayaatf-qp-7200-2: 2000 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayareceiving sensitivity - free field comparison calibration (1 khz to 10 khz ) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayareceiving sensitivity- free field comparison calibration (>100 khz to 500 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayareceiving sensitivity- free field comparison calibration (>10khz to 100 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayasusceptance (1 khz to 500 khz) testing lab in meghalayaatf-qp-7200-2: 2000 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayatransmitting voltage response - free field comparison calibration (1 khz to 10 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayatransmitting voltage response - free field comparison calibration (>10 khz to 100 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayatransmitting voltage response -free field comparison calibration (>100 khz to 500 khz) testing lab in meghalayaiec: 60565: edition 2.0: 2006 standard testing lab in meghalaya
electronics- miscellaneous products laboratory in meghalayaunderwater acoustic transducers, hydrophones, staves testing lab in meghalayaimpedance (1 khz to 500 khz) testing lab in meghalayaansi / asa s1.20: 2012 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayadust ingress protection (enclosures of electrical and electronics equipments) testing lab in meghalayaip1xip2xbip3xip4xip 5xip6x(category 2 enclosure) ip5kip6k testing lab in meghalayaiec/60529 & iso 20653: 2013 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical , electronics and mechanical components testing lab in meghalayalow temperature testing lab in meghalayaiec 60068-2-14:2009, is 9000 (part 2): 1977 (ra 2004) , is 9000 (part 14): 1988(ra 2003, mil 810, jss 55555 ,iec 60068-2-1: 2007 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical , electronics and mechanical components testing lab in meghalayasalt spray testing lab in meghalayaiec 60068-2-11:1981 iec 60068-2-52 : 1996 is (part 2) : 1983 (ra 2004) astm b 117 rev ,2007a jis z 2731: 1994 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical , electronics and mechanical components testing lab in meghalayadamp heat (rh 20% to 98%) testing lab in meghalayaiec 60068-2-78:2012 iec 60068-2-30:2008 iec 60068-2-67:1995 is 9000(part 4):2008 is 9000 (part 5) : 1981 (ra 2007) mil 810 , jss 55555, iso 16750-4: 2010 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical ,electronics and mechanical components testing lab in meghalayahigh temperature storage cum operation testing lab in meghalayaiec 60068-2-1: 2007, iec 60068-2-14:2009, is 9000(part 3):1977 (ra 2004) , is 9000 (part 4):1988 (ra 2003), mil 810,jss 55555, iso 16750-4:: 2010 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical ,electronics and mechanical components testing lab in meghalayahigh temperature test testing lab in meghalayaiec 60068-2-1: 2007, iec 60068-2-14:2009, is 9000(part 3):1977 (ra 2004) , is 9000 (part 4):1988 (ra 2003), mil 810,jss 55555, iso 16750-4:: 2010 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical ,electronics and mechanical components testing lab in meghalayalow temperature operation testing lab in meghalayaiec 60068-2-1: 2007, iec 60068-2-14: 2009 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical ,electronics and mechanical components testing lab in meghalayalow temperature storage testing lab in meghalayaiec 60068-2-1: 2007, iec 60068-2-14: 2009 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical ,electronics and mechanical components testing lab in meghalayalow temperature storage cum operation testing lab in meghalayaiec 60068-2-1: 2007, iec 60068-2-14: 2009 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical ,electronics and mechanical components testing lab in meghalayasine on random testing lab in meghalayasine: is 9000 (part 8) (ra 2003), iec 60068- 2-6:2007, jss 55555:2000 rev.i,jss 50101:1996(ra 2001), jis d1601:2005 mixed mode : iec 60068- 2-80 (part 2):80 , mil-std- 810g, random : iec 60068-2- 64:2008 , iec 61373:: 2010 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical, electronics and mechanical components testing lab in meghalayahigh temperature storage testing lab in meghalayaiec 60068-2-1: 2007, iec 60068-2-14:2009, is 9000(part 3):1977 (ra 2004) , is 9000 (part 4):1988 (ra 2003), mil 810,jss 55555, iso 16750-4:: 2010 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayaelectrical, electronics and mechanical components testing lab in meghalayavibration (sine, random & mixed)up to 2500 kgf testing lab in meghalayasine: is 9000 (part 8) (ra 2003), iec 60068- 2-6:2007, jss 55555:2000 rev.i, jss 50101:1996 (ra 2001), jis d1601:2005 mixed mode : iec 60068- 2-80 (part 2):80 , mil-std- 810g, random : iec 60068-2- 64:2008 , iec 61373: 2010 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayahigh temperature operation testing lab in meghalayahigh temperature operation testing lab in meghalayaiec 60068-2-1: 2007, iec 60068-2-14:2009, is 9000(part 3):1977 (ra 2004) , is 9000 (part 4):1988 (ra 2003), mil 810,jss 55555, iso 16750-4:: 2010 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayawater ingress protection (enclosures of electrical and electronic equipments) testing lab in meghalayaipx1sipx2ipx3ipx4ip x5ipx6ipx6k testing lab in meghalayaiec/60529 & iso 20653: 2013 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayawater ingress protection (enclosures of electrical and electronic equpiments) testing lab in meghalayaipx7,ipx8 testing lab in meghalayaiec/60529 & iso 20653: 2013 standard testing lab in meghalaya
electrical- environmental test facility laboratory in meghalayawater ingress protection (enclosures of electrical and electronic equpiments) testing lab in meghalayaipx9k testing lab in meghalayaiec/60529 & iso 20653: 2013 standard testing lab in meghalaya
mechanical- thermal tests laboratory in meghalayaelectrical ,electronics and mechanical components testing lab in meghalayathermal shock / rapid change of temperature with prescribed time of transfer testing lab in meghalayais 9000 (part 15 sec sec i & sec ii):1988, mil 810,jss 55555, iec 60068-2-14 (tests na & nb): 2009 standard testing lab in meghalaya
mechanical- thermal tests laboratory in meghalayaelectrical, electronics and mechanical components testing lab in meghalayathermal cycling testing lab in meghalayais 9000 (part 15 sec i & sec ii):1988; iec 60068-2-14 (tests nb):2009; mil- std- 810f; iso 16750-4: 2010 standard testing lab in meghalaya
list of our services following cities
24 paraganas north |
24 paraganas south |
alipurduar |
bankura |
birbhum |
coochbehar |
darjeeling |
dinajpur dakshin |
dinajpur uttar |
hooghly |
howrah |
jalpaiguri |
jhargram |
kalimpong |
kolkata |
maldah |
medinipur east |
medinipur west |
murshidabad |
nadia |
paschim bardhaman |
purba bardhaman |
purulia |
agar malwa |
alirajpur |
anuppur |
ashoknagar |
balaghat |
barwani |
betul |
bhind |
bhopal |
burhanpur |
chhatarpur |
chhindwara |
damoh |
datia |
dewas |
dhar |
dindori |
east nimar |
guna |
gwalior |
harda |
hoshangabad |
indore |
jabalpur |
jhabua |
katni |
khargone |
mandla |
mandsaur |
morena |
narsinghpur |
neemuch |
niwari |
panna |
raisen |
rajgarh |
ratlam |
rewa |
sagar |
satna |
sehore |
seoni |
shahdol |
shajapur |
sheopur |
shivpuri |
sidhi |
singrauli |
tikamgarh |
ujjain |
umaria |
vidisha |
ariyalur |
chengalpattu |
chennai |
coimbatore |
cuddalore |
dharmapuri |
dindigul |
erode |
azamgarh |
kallakurichi |
kanchipuram |
kanniyakumari |
karur |
krishnagiri |
madurai |
mayiladuthurai |
nagapattinam |
namakkal |
perambalur |
pudukkottai |
ramanathapuram |
ranipet |
salem |
sivaganga |
tenkasi |
thanjavur |
theni |
the nilgiris |
thiruvallur |
thiruvarur |
tiruchirappalli |
tirunelveli |
tirupathur |
tiruppur |
tiruvannamalai |
tuticorin |
vellore |
villupuram |
virudhunagar |
nicobars |
north and middle andaman |
south andamans |
anantapur |
chittoor |
east godavari |
guntur |
krishna |
kurnool |
prakasam |
spsr nellore |
srikakulam |
visakhapatanam |
vizianagaram |
west godavari |
y.s.r. |
anjaw |
changlang |
dibang valley |
east kameng |
east siang |
kamle |
kra daadi |
kurung kumey |
leparada |
lohit |
longding |
lower dibang valley |
lower siang |
lower subansiri |
namsai |
pakke kessang |
papum pare |
shi yomi |
siang |
tawang |
tirap |
upper siang |
upper subansiri |
west kameng |
west siang |
baksa |
barpeta |
biswanath |
bongaigaon |
cachar |
charaideo |
chirang |
kannur |
darrang |
dhemaji |
dhubri |
dibrugarh |
dima hasao |
goalpara |
golaghat |
hailakandi |
hojai |
jorhat |
kamrup |
kamrup metro |
karbi anglong |
karimganj |
kokrajhar |
lakhimpur |
majuli |
marigaon |
nagaon |
nalbari |
sivasagar |
sonitpur |
south salmara mancachar |
tinsukia |
udalguri |
west karbi anglong |
araria |
arwal |
aurangabad |
banka |
begusarai |
bhagalpur |
bhojpur |
buxar |
darbhanga |
gaya |
gopalganj |
jamui |
jehanabad |
kaimur (bhabua) |
katihar |
khagaria |
kishanganj |
lakhisarai |
madhepura |
madhubani |
munger |
muzaffarpur |
nalanda |
nawada |
pashchim champaran |
patna |
purbi champaran |
purnia |
rohtas |
saharsa |
samastipur |
saran |
sheikhpura |
sheohar |
sitamarhi |
siwan |
supaul |
vaishali |
chandigarh |
balod |
baloda bazar |
balrampur |
bastar |
bemetara |
bijapur |
bilaspur |
dantewada |
dhamtari |
durg |
gariyaband |
gaurella pendra marwahi |
janjgir-champa |
jashpur |
kabirdham |
kanker |
kondagaon |
korba |
korea |
mahasamund |
mungeli |
narayanpur |
raigarh |
raipur |
rajnandgaon |
sukma |
surajpur |
surguja |
central delhi |
east delhi |
new delhi |
north delhi |
north east delhi |
north west delhi |
shahdara |
south delhi |
south east delhi |
south west delhi |
west delhi |
north goa |
south goa |
ahmadabad |
amreli |
anand |
arvalli |
banas kantha |
bharuch |
bhavnagar |
botad |
chhotaudepur |
dang |
devbhumi dwarka |
dohad |
gandhinagar |
gir somnath |
jamnagar |
junagadh |
kachchh |
kheda |
mahesana |
mahisagar |
morbi |
narmada |
navsari |
panch mahals |
patan |
porbandar |
rajkot |
sabar kantha |
surat |
surendranagar |
tapi |
vadodara |
valsad |
ambala |
bhiwani |
charki dadri |
faridabad |
fatehabad |
gurugram |
hisar |
jhajjar |
jind |
kaithal |
karnal |
kurukshetra |
mahendragarh |
nuh |
palwal |
panchkula |
panipat |
rewari |
rohtak |
sirsa |
sonipat |
yamunanagar |
bilaspur |
chamba |
hamirpur |
kangra |
kinnaur |
kullu |
lahul and spiti |
mandi |
shimla |
sirmaur |
solan |
una |
anantnag |
bandipora |
baramulla |
budgam |
doda |
ganderbal |
jmeghalaya |
kathua |
kishtwar |
kulgam |
kupwara |
poonch |
pulwama |
kasaragod |
rajouri |
ramban |
reasi |
samba |
shopian |
srinagar |
udhampur |
bokaro |
chatra |
deoghar |
dhanbad |
dumka |
east singhbum |
garhwa |
giridih |
godda |
gumla |
hazaribagh |
jamtara |
khunti |
koderma |
latehar |
lohardaga |
pakur |
palamu |
ramgarh |
ranchi |
sahebganj |
saraikela kharsawan |
simdega |
west singhbhum |
bagalkote |
ballari |
belagavi |
bengaluru rural |
bengaluru urban |
bidar |
chamarajanagara |
chikkaballapura |
chikkamagaluru |
chitradurga |
dakshina kannada |
davangere |
dharwad |
gadag |
hassan |
haveri |
kalaburagi |
kodagu |
kolar |
koppal |
mandya |
mysuru |
raichur |
ramanagara |
shivamogga |
tumakuru |
udupi |
uttara kannada |
vijayapura |
yadgir |
alappuzha |
ernakulam |
idukki |
kollam |
kottayam |
kozhikode |
malappuram |
palakkad |
pathanamthitta |
thiruvananthapuram |
thrissur |
wayanad |
kargil |
leh ladakh |
lakshadweep district |
ahmednagar |
akola |
amravati |
aurangabad |
beed |
bhandara |
buldhana |
chandrapur |
dhule |
gadchiroli |
gondia |
hingoli |
jalgaon |
jalna |
kolhapur |
latur |
mumbai |
mumbai suburban |
nagpur |
nanded |
nandurbar |
nashik |
osmanabad |
palghar |
parbhani |
pune |
raigad |
ratnagiri |
sangli |
satara |
sindhudurg |
solapur |
thane |
wardha |
washim |
yavatmal |
bishnupur |
chandel |
churachandpur |
imphal east |
imphal west |
jiribam |
kakching |
kamjong |
kangpokpi |
noney |
pherzawl |
senapati |
tamenglong |
tengnoupal |
thoubal |
ukhrul |
east garo hills |
east jaintia hills |
east khasi hills |
north garo hills |
ri bhoi |
south garo hills |
south west garo hills |
south west khasi hills |
west garo hills |
west jaintia hills |
west khasi hills |
aizawl |
gurdaspur |
champhai |
hnahthial |
khawzawl |
kolasib |
lawngtlai |
lunglei |
mamit |
saiha |
saitual |
serchhip |
dimapur |
kiphire |
kohima |
longleng |
mokokchung |
mon |
noklak |
peren |
phek |
tuensang |
wokha |
zunheboto |
anugul |
balangir |
baleshwar |
bargarh |
bhadrak |
boudh |
cuttack |
deogarh |
dhenkanal |
gajapati |
ganjam |
jagatsinghapur |
jajapur |
jharsuguda |
kalahandi |
kandhamal |
kendrapara |
kendujhar |
khordha |
koraput |
malkangiri |
mayurbhanj |
nabarangpur |
nayagarh |
nuapada |
puri |
rayagada |
sambalpur |
sonepur |
sundargarh |
karaikal |
mahe |
pondicherry |
yanam |
amritsar |
barnala |
bathinda |
faridkot |
fatehgarh sahib |
fazilka |
firozepur |
hoshiarpur |
jalandhar |
kapurthala |
ludhiana |
mansa |
moga |
pathankot |
patiala |
rupnagar |
sangrur |
s.a.s nagar |
shahid bhagat singh nagar |
sri muktsar sahib |
tarn taran |
ajmer |
alwar |
banswara |
baran |
barmer |
bharatpur |
bhilwara |
bikaner |
bundi |
chittorgarh |
churu |
dausa |
dholpur |
dungarpur |
ganganagar |
hanumangarh |
jaipur |
jaisalmer |
jalore |
jhalawar |
jhunjhunu |
jodhpur |
karauli |
kota |
nagaur |
pali |
pratapgarh |
rajsamand |
sawai madhopur |
sikar |
sirohi |
tonk |
udaipur |
east district |
north district |
south district |
west district |
adilabad |
bhadradri kothagudem |
hyderabad |
jagitial |
jangoan |
jayashankar bhupalapally |
jogulamba gadwal |
kamareddy |
karimnagar |
khammam |
kumuram bheem asifabad |
mahabubabad |
mahabubnagar |
mancherial |
medak |
medchal malkajgiri |
baghpat |
mulugu |
nagarkurnool |
nalgonda |
narayanpet |
nirmal |
nizamabad |
peddapalli |
rajanna sircilla |
ranga reddy |
sangareddy |
siddipet |
suryapet |
vikarabad |
wanaparthy |
warangal rural |
warangal urban |
yadadri bhuvanagiri |
dadra and nagar haveli |
daman |
diu |
dhalai |
gomati |
khowai |
north tripura |
sepahijala |
south tripura |
unakoti |
west tripura |
almora |
bageshwar |
chamoli |
champawat |
dehradun |
haridwar |
nainital |
pauri garhwal |
pithoragarh |
rudra prayag |
tehri garhwal |
udam singh nagar |
uttar kashi |
agra |
aligarh |
ambedkar nagar |
amethi |
amroha |
auraiya |
ayodhya |
bahraich |
ballia |
balrampur |
banda |
barabanki |
bareilly |
basti |
bhadohi |
bijnor |
budaun |
bulandshahr |
chandauli |
chitrakoot |
deoria |
etah |
etawah |
farrukhabad |
fatehpur |
firozabad |
gautam buddha nagar |
ghaziabad |
ghazipur |
gonda |
gorakhpur |
hamirpur |
hapur |
hardoi |
hathras |
jalaun |
jaunpur |
jhansi |
kannauj |
kanpur dehat |
kanpur nagar |
kasganj |
kaushambi |
kheri |
kushi nagar |
lalitpur |
lucknow |
maharajganj |
mahoba |
mainpuri |
mathura |
mau |
meerut |
mirzapur |
moradabad |
muzaffarnagar |
pilibhit |
pratapgarh |
prayagraj |
rae bareli |
rampur |
saharanpur |
sambhal |
sant kabeer nagar |
shahjahanpur |
shamli |
shravasti |
siddharth nagar |
sitapur |
sonbhadra |
sultanpur |
unnao |
varanasi ...
list of our services following states
andaman and nicobar islands |
andhra pradesh |
arunachal pradesh |
assam |
bihar |
chandigarh |
chhattisgarh |
delhi |
goa |
gujarat |
haryana |
himachal pradesh |
jmeghalaya and kashmir |
jharkhand |
karnataka |
kerala |
ladakh |
lakshadweep |
madhya pradesh |
maharashtra |
manipur |
meghalaya |
mizoram |
nagaland |
odisha |
puducherry |
punjab |
rajasthan |
sikkim |
tamil nadu |
telangana |
the dadra and nagar haveli and daman and diu |
tripura |
uttarakhand |
uttar pradesh |
west bengal ...
list of our services following districts
alipurduar - i |
alipurduar - ii |
amdanga |
amta - i |
amta - ii |
arambag |
arsha |
ausgram - i |
ausgram - ii |
baduria |
bagda |
bagmundi |
bagnan - i |
bagnan - ii |
balagarh |
balarampur |
bally jagachha |
balurghat |
bamangola |
bankura - i |
bankura - ii |
bansihari |
barabani |
barabazar |
barasat - i |
barasat - ii |
barjora |
barrackpur - i |
barrackpur - ii |
baruipur |
basanti |
basirhat - i |
basirhat - ii |
beldanga - i |
beldanga - ii |
berhampore |
bhagawangola - i |
bhagawangola - ii |
bhagawanpur - i |
bhagawanpur - ii |
bhangar - i |
bhangar - ii |
bharatpur - i |
bharatpur - ii |
bhatar |
binpur - i |
binpur - ii |
bishnupur - i |
bishnupur - ii |
bolpur sriniketan |
bongaon |
budge budge - i |
budge budge - ii |
bundwan |
burdwan - i |
burdwan - ii |
burwan |
canning - i |
canning - ii |
chakdah |
chanchal - i |
chanchal - ii |
chandipur |
chanditala - i |
chanditala - ii |
chandrakona - i |
chandrakona - ii |
chapra |
chhatna |
chinsurah - magra |
chopra |
contai - i |
contai - iii |
cooch behar - i |
cooch behar - ii |
dantan - i |
dantan - ii |
darjeeling pulbazar |
daspur - i |
daspur - ii |
debra |
deganga |
deshopran |
dhaniakhali |
dhupguri |
diamond harbour - i |
diamond harbour - ii |
dinhata - i |
dinhata - ii |
domjur |
domkal |
dubrajpur |
egra - i |
egra - ii |
english bazar |
falakata |
falta |
farakka |
faridpur durgapur |
gaighata |
galsi - i |
galsi - ii |
gangajalghati |
gangarampur |
garbeta - i |
garbeta - ii |
garbeta - iii |
gazole |
ghatal |
goalpokhar - i |
goalpokhar - ii |
goghat - i |
goghat - ii |
gopiballavpur - i |
gopiballavpur - ii |
gorubathan |
gosaba |
habibpur |
habra - i |
habra - ii |
haldia |
haldibari |
hanskhali |
hariharpara |
haringhata |
haripal |
harirampur |
harischandrapur - i |
harischandrapur - ii |
haroa |
hasnabad |
hemtabad |
hilli |
hingalganj |
hirbandh |
hura |
illambazar |
indpur |
indus |
islampur |
itahar |
jagatballavpur |
jaipur |
jalangi |
jalpaiguri |
jamalpur |
jamboni |
jamuria |
jangipara |
jaynagar - i |
jaynagar - ii |
jaypur |
jhalda - i |
jhalda - ii |
jhargram |
jorebunglow sukiapokhri |
kakdwip |
kalchini |
kaliachak - i |
kaliachak - ii |
kaliachak - iii |
kaliaganj |
kaliganj |
kalimpong -i |
kalimpong - ii |
kalna - i |
kalna - ii |
kalyani |
kandi |
kanksa |
karandighi |
karimpur - i |
karimpur - ii |
kashipur |
katwa - i |
katwa - ii |
keshiary |
keshpur |
ketugram - i |
ketugram - ii |
khanakul - i |
khanakul - ii |
khandaghosh |
kharagpur - i |
kharagpur - ii |
khargram |
kharibari |
khatra |
khejuri - i |
khejuri - ii |
khoyrasol |
kolaghat |
kotulpur |
krishnaganj |
krishnagar - i |
krishnagar - ii |
kulpi |
kultali |
kumarganj |
kumargram |
kurseong |
kushmundi |
labpur |
lalgola |
lava |
madarihat |
magrahat - i |
magrahat - ii |
mahisadal |
mal |
maldah (old) |
manbazar - i |
manbazar - ii |
mandirbazar |
mangolkote |
manikchak |
manteswar |
mathabhanga - i |
mathabhanga - ii |
mathurapur - i |
mathurapur - ii |
matiali |
matigara |
maynaguri |
mayureswar - i |
mayureswar - ii |
mejhia |
mekliganj |
memari - i |
memari - ii |
midnapore |
minakhan |
mirik |
mohammad bazar |
mohanpur |
moyna |
murarai - i |
murarai - ii |
murshidabad jiaganj |
nabadwip |
nabagram |
nagrakata |
nakashipara |
nalhati - i |
nalhati - ii |
namkhana |
nanda kumar |
nandigram - i |
nandigram - ii |
nanoor |
narayangarh |
nawda |
naxalbari |
nayagram |
neturia |
onda |
ondal |
panchla |
pandabeswar |
pandua |
panskura |
para |
patharpratima |
patrasayer |
pedong |
phansidewa |
pingla |
polba - dadpur |
potashpur - i |
potashpur - ii |
puncha |
purbasthali - i |
purbasthali - ii |
pursura |
purulia - i |
purulia - ii |
raghunathganj - i |
raghunathganj - ii |
raghunathpur - i |
raghunathpur - ii |
raiganj |
raina - i |
raina - ii |
raipur |
rajarhat |
rajganj |
rajnagar |
ramnagar - i |
ramnagar - ii |
rampurhat - i |
rampurhat - ii |
ranaghat - i |
ranaghat - ii |
rangli rangliot |
ranibundh |
raniganj |
raninagar - i |
raninagar - ii |
ratua - i |
ratua - ii |
sabang |
sagar |
sagardighi |
sahid matangini |
sainthia |
salanpur |
salbani |
saltora |
samserganj |
sandeshkhali - i |
sandeshkhali - ii |
sankrail |
sankrail |
santipur |
santuri |
sarenga |
serampur uttarpara |
shyampur - i |
shyampur - ii |
simlapal |
singur |
sitai |
sitalkuchi |
sonamukhi |
sonar pur |
suri - i |
suri - ii |
sutahata |
suti - i |
suti - ii |
swarupnagar |
taldangra |
tamluk |
tapan |
tarakeswar |
tehatta - i |
tehatta - ii |
thakurpukur mahestola |
tufanganj - i |
tufanganj - ii |
udaynarayanpur |
uluberia - i |
uluberia - ii |
vishnupur ...
list of our services following districts
car nicobar |
diglipur |
ferrargunj |
great nicobar |
little andaman |
mayabunder |
nancowry |
port blair |
rangat |
aalo hq |
anelih |
anini |
bagra circle |
balemu circle |
balijan adc |
bameng adc |
bana eac |
banderdewa circle |
baririjo circle |
basar adc |
bhalukpong eac |
bilat circle |
boleng adc |
bomdila hq |
bongkhar circle |
bordumsa adc |
borduria circle |
borum |
buragaon eac |
chaglagam circle |
chambang circle |
changlang hq |
chayangtajo adc |
chetam peer yapu circle |
chongkham eac |
dadam circle |
dambuen circle |
dambuk adc |
damin circle |
daporijo hq |
darak circle |
daring circle |
debeyar co circle |
deed circle |
deomali adc |
desali circle |
dirang adc |
dissing passo circle |
diyun eac |
doimukh sdo |
dollungmukh circle |
dudunghar circle |
dumporijo adc |
etalin |
gangte circle |
geku eac |
gelling circle |
gensi eac |
gepen circle |
giba circle |
gite ripa circle |
goiliang circle |
gumto circle |
gyawe purang circle |
hawai hq |
hayuliang adc |
hunli sdo |
itanagar eac |
jairampur adc |
jamiri circle |
jang adc |
jengging circle |
jomlo mobuk circle |
kakoi circle |
kalaktang adc |
kamba adc |
kamengbari doimara circle |
kamporijo circle |
kangku circle |
kantang circle |
kanubari adc |
katan circle |
katang circle |
kaying eac |
kebang circle |
kharsang circle |
khenawa circle |
khimiyang eac |
khonsa hq |
kibithoo circle |
kimin sdo |
kitpi circle |
koloriang hq |
kombo circle |
kora circle |
koronu circle |
koyu eac |
kronli (arzoo circle) |
lada circle |
laju sdo |
lathao circle |
lawnu circle |
lekang mahadevpur circle |
leporiang circle |
lhou circle |
likabali sdo |
limeking circle |
liromoba eac |
longding hq |
longo circle |
lumla adc |
lyngok longtoi circle |
manchal circle |
manmao eac |
mariyang adc |
maro circle |
mebo adc |
mechuka adc |
mengio eac |
metengliang circle |
miao adc |
migging circle |
mipi |
monigong eac |
mopom adipasi circle |
mukto circle |
nacho sdo |
nafra eac |
naharlagun eac |
nampong sdo |
namsai hq |
namsing circle |
namtok eac |
nari adc |
new seren circle |
nikte kodum circle |
nilling circle |
nyapin adc |
nyobia circle |
old ziro sdo |
oyan circle |
pakke kessang eac |
pakoti circle |
palin circle |
palling circle |
pangchao sdo |
pangin eac |
parang circle |
parbuk sdo |
pasighat hq |
passa valley circle |
patuk adc |
payeng circle |
payum circle |
phassang circle |
pidi circle |
pipsorang circle |
pipu dipu circle |
pistana circle |
piyong circle |
pizirang veo circle |
polosang circle |
puchi geko circle |
pumao circle |
raga adc |
rebo perging circle |
renuk circle |
richukrong circle |
riga eac |
roing hq |
ruksin adc |
rumgong adc |
rupa sdo |
sagalee adc |
sago |
sangdupota basar nello circle |
sangram sdo |
sarli circle |
sawa circle |
segi gusar circle |
seijosa adc |
seppa hq |
shergaon circle |
sibe circle |
silsango circle |
singa circle |
singchung adc |
siyum adc |
soha circle |
sunpura circle |
taksing circle |
tali adc |
taliha adc |
tarak lengdi cicle |
taraso circle |
tato eac |
tawang hq |
tezu hq |
thembang circle |
thingbu circle |
thrizino adc |
tikhak rima putok circle |
tinali paglam circle |
tirbin eac |
toru circle |
tuting adc |
vijoynagar eac |
wakka sdo |
wakro circle |
walong circle |
yachuli adc |
yangte circle |
yatdam circle |
yazali circle |
yingkiong circle |
yomcha adc |
zemithang circle |
ziro hq |
agamoni |
algapur |
amguri |
athani |
azara |
badarpur |
baganpara (pt) |
baghbor |
bagribari (pt) |
bajali (pt) |
balijana |
banekuchi |
barama pt |
barbhag |
barkhetri |
barnagar (pt) |
barpeta |
baska |
bengtol |
bhowraguri |
bhuragaon |
bihpuria |
bijni (pt) |
bilasipara pt |
biswanath |
boitamari |
bokakhat |
boko |
bongaigaon (pt) |
chabua |
chamaria |
chandrapur |
chapar pt |
chariduar |
chenga |
chhaygaon |
dalgaon (pt) |
dangtal revenue circle |
dergaon |
dhakuakhana (pt-i) |
dhekiajuli (pt) |
dhemaji |
dhing |
dhubri |
dibrugarh east |
dibrugarh west |
dimow |
diphu |
dispur |
doboka |
donka |
doom dooma |
dotoma |
dudhnai |
gauripur |
ghograpar (pt) |
gogamukh |
gohpur |
golaghat |
golakganj pt |
goreswar (pt) |
goroimari |
gossaigaon (pt) |
guwahati |
haflong |
hailakandi |
hajo |
harisinga |
helem |
hojai |
jalah (pt) |
jonai |
jorhat east |
jorhat west |
kadam |
kalaigaon |
kalgachia |
kaliabor |
kamalpur |
kampur |
karimganj |
katigora |
katlichara |
khoirabari |
khumtai |
kokrajhar |
koya |
laharighat |
lakhipur |
lakhipur |
lala |
lanka |
mahmora |
majuli |
mangaldoi (pt) |
mankachar |
margherita |
mariani |
marigaon |
matia |
mayong |
mazbat |
mikirbheta |
moran |
morangi |
na-duar |
nagaon |
nagarbera |
naharkatiya |
nalbari |
naobaicha |
narayanpur |
nazira |
nilambazar |
north guwahati (pt) |
north lakhimpur |
pachim nalbari |
palasbari |
patharkandi |
pathorighat (pt) |
phuloni |
raha |
ramkrishna nagar |
rangia pt |
rangjuli |
rupahi |
sadiya |
samaguri |
sapekhati |
sarthebari |
sarupathar |
sarupeta (pt) |
sibsagar |
sidli (pt) |
silchar |
silonijan |
sipajhar |
sissibargaon |
sonai |
sonapur |
sonari |
sonari |
south salmara |
srijangram |
subansiri (pt-i) |
tamulpur |
tengakhat |
teok |
tezpur |
thelamara |
tihu (pt) |
tingkhong |
tinsukia |
titabor |
udalguri |
udarbond |
ujani majuli circle |
bishnupur |
borobekra |
bungte chiru |
chakpikarong |
champhai |
chandel |
chilivai phaibung |
chingai |
churachandpur |
haochong |
henglep |
island |
jessami |
jiribam |
kakching |
kamjong |
kangchup geljang |
kangpokpi |
kangvai |
kasom khullen |
keirao bitra |
khengjoy |
khoupum |
lamphelpat |
lamsang |
lhungtin |
lilong |
lm |
longmai |
machi |
moirang |
moreh |
mualnuam |
nambol |
nungba |
paomata |
patsoi |
phungyar |
porompat |
purul |
sahamphung |
saikot |
saikul |
saitu-gamphazol |
samulamlan |
sangaikot |
sawombung |
singngat |
song song |
suangdoh |
tadubi |
tamenglong |
tamenglong north |
tamenglong west |
tengnoupal |
thanlon |
thoubal |
tipaimukh |
tuibong |
t vaichong |
ukhrul |
vangai range |
waikhong |
wangoi |
willong |
amlarem |
baghmara |
bajengdoba |
betasing |
bhoirymbong |
chokpot |
dadenggiri |
dalu |
damalgre |
dambo rongjeng |
demdema |
gambegre |
gasuapara |
jirang |
kharkutta |
khatarshnong laitkroh |
khliehriat |
laskein |
mairang |
mawkynrew |
mawkyrwat |
mawlai |
mawpat |
mawphlang |
mawryngkneng |
mawshynrut |
mawsynram |
mawthadraishan |
mylliem |
nongstoin |
pynursla |
ranikor |
resubelpara |
rongara |
rongram |
saipung |
samanda |
selsella |
shella bholaganj |
sohiong |
songsak |
thadlaskein |
tikrikilla |
umling |
umsning |
zikzak |
aibawk |
bilkhawthlir |
champhai |
chawngte |
darlawn |
east lungdar |
hnahthial |
khawbung |
khawzawl |
lawngtlai |
lunglei |
lungsen |
ngopa |
'n' thingdawl |
phullen |
reiek |
saiha |
sangau |
s' bungtlang |
serchhip |
thingsulthliah |
tlangnuam |
tuipang |
west bunghmun |
west phaileng |
zawlnuam |
aboi |
aghunato |
aitepyong |
akuhaito |
akuluto |
alongkima |
amahator |
angjangyang |
aquqhnaqua |
asuto |
athibung |
atoizu |
baghty |
bhandari |
botsa |
changpang |
changtongya |
chare |
chen |
chessore |
chetheba |
chiephobozou |
chingmei |
chizami |
chozuba |
chuchuyimlang |
chukitong |
chumukedima |
chunlikha |
dhansiripar |
dimapur sadar |
englan |
ghathashi |
hunta |
jakhama |
jalukie |
kebai khelma |
kezocha |
khezhakeno |
khongsa |
khuza |
kikruma |
kiphire sadar |
kiusam |
kohima sadar |
kubolong |
kuhoboto |
longchem |
longkhim |
longleng |
longmatra |
longshen |
lotsu |
mangko |
mangkolemba |
medziphema |
meluri |
merangmen |
mon sadar |
monyakshu |
mopong |
naginimora |
namsang |
ngoungchung |
nihokhu |
niuland |
nokhu |
noklak |
noksen |
nsong |
ongpangkong |
ongpangkong (n) |
panso |
pedi (ngwalwa) |
peren |
pfutsero |
phek sadar |
phokhungri |
phomching |
phor |
pughoboto |
pungro |
ralan |
razieba |
sakraba |
sakshi |
sangsangnyu |
sanis |
saptiqa |
satakha |
satoi |
sechu-zubza |
sekruzu |
seyochung |
shamator |
shangnyu |
sitimi |
sotokur |
sungro |
suruhuto |
tamlu |
tening |
thonoknyu |
tizit |
tobu |
tokiye |
tseminyu |
tsogin |
tsurangkong |
tsurungto |
tuensang sadar |
tuli |
v.k. |
wakching |
weziho |
wokha sadar |
wozhuro |
yongnyah |
zuketsa |
zunheboto sadar |
chungthang |
dentam |
dzongu |
gangtok |
gyalshing |
jorethang |
kabi |
mangan |
namchi |
pakyong |
rangpo |
ravong |
rongli |
soreng |
yangang |
yuksom |
amarpur |
ambassa |
belonia |
bishalgarh |
dharmanagar |
gandacherra |
jampuijala |
jirania |
kailashahar |
kamalpur |
kanchanpur |
karbook |
khowai |
kumarghat |
longtharai valley |
mohanpur |
panisagar |
sabroom |
sadar |
santirbazar |
sonamura |
teliamura |
udaipur ...
list of our services following countries
India |
China |
United States |
Indonesia |
Pakistan |
Brazil |
Nigeria |
Bangladesh |
Russia |
Mexico |
Japan |
Ethiopia |
Philippines |
Egypt |
Vietnam |
DR Congo |
Turkey |
Iran |
Germany |
Thailand |
United Kingdom |
France |
Italy |
Tanzania |
South Africa |
Myanmar |
Kenya |
South Korea |
Colombia |
Spain |
Uganda |
Argentina |
Algeria |
Sudan |
Ukraine |
Iraq |
Afghanistan |
Poland |
Canada |
Morocco |
Saudi Arabia |
Uzbekistan |
Peru |
Angola |
Malaysia |
Mozambique |
Ghana |
Yemen |
Nepal |
Venezuela |
Madagascar |
Cameroon |
Côte d'Ivoire |
North Korea |
Australia |
Niger |
Sri Lanka |
Burkina Faso |
Mali |
Romania |
Malawi |
Chile |
Kazakhstan |
Zambia |
Guatemala |
Ecuador |
Syria |
Netherlands |
Senegal |
Cambodia |
Chad |
Somalia |
Zimbabwe |
Guinea |
Rwanda |
Benin |
Burundi |
Tunisia |
Bolivia |
Belgium |
Haiti |
Cuba |
South Sudan |
Dominican Republic |
Czech Republic |
Greece |
Jordan |
Portugal |
Azerbaijan |
Sweden |
Honduras |
United Arab Emirates |
Hungary |
Tajikistan |
Belarus |
Austria |
Papua New Guinea |
Serbia |
Israel |
Switzerland |
Togo |
Sierra Leone |
Laos |
Paraguay |
Bulgaria |
Libya |
Lebanon |
Nicaragua |
Kyrgyzstan |
El Salvador |
Turkmenistan |
Singapore |
Denmark |
Finland |
Congo |
Slovakia |
Norway |
Oman |
State of Palestine |
Costa Rica |
Liberia |
Ireland |
Central African Republic |
New Zealand |
Mauritania |
Panama |
Kuwait |
Croatia |
Moldova |
Georgia |
Eritrea |
Uruguay |
Bosnia and Herzegovina |
Mongolia |
Armenia |
Jamaica |
Qatar |
Albania |
Lithuania |
Namibia |
Gambia |
Botswana |
Gabon |
Lesotho |
North Macedonia |
Slovenia |
Guinea-Bissau |
Latvia |
Bahrain |
Equatorial Guinea |
Trinidad and Tobago |
Estonia |
Timor-Leste |
Mauritius |
Cyprus |
Eswatini |
Djibouti |
Fiji |
Comoros |
Guyana |
Bhutan |
Solomon Islands |
Montenegro |
Luxembourg |
Suriname |
Cabo Verde |
Micronesia |
Maldives |
Malta |
Brunei |
Belize |
Bahamas |
Iceland |
Vanuatu |
Barbados |
Sao Tome & Principe |
Samoa |
Saint Lucia |
Kiribati |
Grenada |
St. Vincent & Grenadines |
Tonga |
Seychelles |
Antigua and Barbuda |
Andorra |
Dominica |
Marshall Islands |
Saint Kitts & Nevis |
Monaco |
Liechtenstein |
San Marino |
Palau |
Tuvalu |
Nauru |
Holy See ...