AN ISO/IEC - 17025 STANDARD - NABL ACCREDITATION LABORATORY / TRAINING AND CERTIFICATION - MECH - CIVIL - ELECTRICAL & IT COURSES / A to Z LABORATORY TESTING SERVICES / INSPECTION SERVICES / ALL ENGINEERING CONTRACTORS / MORE THAN 1500 SERVICES ...

CURRENT TRANSFORMER TESTING LAB - STANDARDS
 
 
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • verification of terminal marking & polarity testing lab in congo
  • is 2705 (part 1) cl. no. 8.2 is 16227(part 1) cl. no. 7.3.6 is 16227(part 2) cl. no. 7.3.6 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • limits of current error and phase displacement testing lab in congo
  • is 2705 (part 2) cl. no. 3.3 is 16227(part 1) cl. no. 7.3.5 is 16227(part 2) cl. no. 7.3.5 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • ac voltage test testing lab in congo
  • is 13779 cl. no. 12.7.6.3 is 14697 cl. no. 12.7.6.3 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • insulation resistance testing lab in congo
  • is 13779 cl. no. 12.7.6.4 is 14697 cl. no. 12.7.6.4 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • limits of errors testing lab in congo
  • is 13779 cl. no. 11.1 is 14697 cl. no. 11.1 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • meter constant testing lab in congo
  • is 13779 cl. no. 11.6 is 14697 cl. no. 12.14 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • starting conditions testing lab in congo
  • is 13779 cl. no. 12.14 is 14697 cl. no. 12.13 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • no-load condition testing lab in congo
  • is 13779 cl. no. 12.13 is 14697 cl. no. 12.12 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • repeatability of error testing lab in congo
  • is 13779 cl. no. 12.17 is 14697 cl. no. 12.16 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • initial start-up of the energy meter testing lab in congo
  • is 13779 cl. no. 11.4.1 is 14697 cl. no. 11.4.1 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • power consumption testing lab in congo
  • is 13779 cl. no. 9.1 is 14697 cl. no. 9.1 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • verification of average frequency slot testing lab in congo
  • central electricity authority notification no:502/70/cea/dp&d dtd: 17/03/2006 schedule part ii 1b standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • verification of reactive energy registration in total, low and high var registers testing lab in congo
  • central electricity authority notification no:502/70/cea/dp&d dtd: 17/03/2006 schedule part ii 1b standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • short circuit impedance and load losses testing lab in congo
  • is 2026 (part 1) cl. no. 10.4 is 1180 (part 1) cl. no. 21.2c is 11171, iec 60076 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • no load losses and current testing lab in congo
  • is 2026 (part i) cl. no. 10.5 is 1180 (part i) cl. no. 21.2d standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • temperature rise testing lab in congo
  • is 2026(part ii) cl. no. 5, 10.4 is 2026 (part i) cl. no. 5.6 is 1180 (part i) cl. no. 21.2, 21.3 b 6.10, 7.10, 8.10) standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • induced ac voltage test testing lab in congo
  • (cl. no. 12.1) is 2026 (part iii) cl. no. 12.1 is 11171 cl. no. 15 is 1180 (part i) cl. no. 21.2f standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • separate source ac withstand voltage test testing lab in congo
  • is 2026 (part iii) cl. no. 11 is 11171 cl. no. 14.1 is 1180 (part i) cl. no. 21.2g standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • unbalanced current testing lab in congo
  • cbip publication no. gp 317: 2013 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • zero sequence impedance for 3 phase transformer testing lab in congo
  • is 2026 (part-i) cl. no. 10.7 is 11171 is 1180 (part i) standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • air pressure testing lab in congo
  • is 1180 (part 1) cl. no. 15.2, 21.5, 21.5.1, 21.5.1.2 , 21.5.2.1, 21.5.2.2 21.5.3.1, 21.5.3.2) cbip publication no 317: 2013 cl. no. 17.3,3 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • vacuum testing lab in congo
  • is 1180 (part 1) cl. no. 15.2, 21.5, 21.5.1, 21.5.1.2 , 21.5.2.1, 21.5.2.2 21.5.3.1, 21.5.3.2) cbip publication no 317: 2013 cl. no. 17.3.3 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • oil leakage testing lab in congo
  • is 1180(part 1) cl. no. 21.2j, 21.5, 21.5.1.3, 21.5.2.3, 21.5.3.3 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • paint adhesion testing lab in congo
  • is 1180 (part 1) cl. no. 21.4d astm d 3359 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • moisture content of oil in the transformer testing lab in congo
  • is 1180 (part 1) cl. no. 21.4 e, is 335:1993 cl. no. 3.5 is 2026 (part i) is 13567 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • bdv in the transformer testing lab in congo
  • is 1180 (part 1):2014 cl. no. 21.4 e, (is 335:1993 cl 3.5) is 2026 (part i) is 13567 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • permissible flux density and over fluxing testing lab in congo
  • is 1180 (part 1) cl. no. 6.9, 7.9, 8.9 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • sound level testing lab in congo
  • is 1180:2014, cl. no. 21.4 a is 2026 : 2011 part 1. standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • cl. no. 10.1.3 cbip publication no 317: 2013 is 2026 (part10) : 2009 is 13964 : 1994 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • harmonics of the no load current testing lab in congo
  • is 2026 part 1: 2011 cl. no. : 10.6 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • winding resistance testing lab in congo
  • is 2026 (part i) cl. no. 10.2 is 1180 (part 1) cl. no. 21.2 a is 11171 iec: 60076 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • voltage ratio and check of phase displacement (vector group) testing lab in congo
  • is 2026 (part i) cl. no.10.3 is 1180 (part 1) cl. no. 21.2 b, 6.5, 6.6. 7.5, 7.6, 8.5, 8.6 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • insulation resistance to earth of the windings testing lab in congo
  • is 2026 (part i) cl. no. 10.1.3, 16.6 is 1180 (part 1) cl. no. 21.2 e standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • magnetic balance test at low voltage testing lab in congo
  • cbip publication no 317: 2013 standard testing lab in congo
  •  
  • current transformer 1 a – 3200 a / 5 – 1a testing lab in congo
  • magnetizing current at low voltage testing lab in congo
  • cbip publication no 317: 2013 is 2026(part-i):2011 standard testing lab in congo
  •  
  • distribution/power transformers upto 100 mva 220 kv class testing lab in congo
  • winding resistance testing lab in congo
  • is 2026 (part i) cl. no. 10.2 is 1180 (part 1) cl. no. 21.2 a is 11171 iec: 60076 standard testing lab in congo
  •  
  • distribution/power transformers upto 100 mva 220 kv class testing lab in congo
  • voltage ratio and check of phase displacement (vector group) testing lab in congo
  • is 2026 (part i) cl. no.10.3 is 1180 (part 1) cl. no. 21.2 b, 6.5, 6.6. 7.5, 7.6, 8.5, 8.6 standard testing lab in congo
  •  
  • distribution/power transformers upto 100 mva 220 kv class testing lab in congo
  • insulation resistance to earth of the windings testing lab in congo
  • is 2026 (part i) cl. no. 10.1.3, 16.6 is 1180 (part 1) cl. no. 21.2 e standard testing lab in congo
  •  
  • distribution/power transformers upto 100 mva 220 kv class testing lab in congo
  • magnetic balance test at low voltage testing lab in congo
  • cbip publication no 317: 2013 standard testing lab in congo
  •  
  • distribution/power transformers upto 100 mva 220 kv class testing lab in congo
  • magnetizing current at low voltage testing lab in congo
  • cbip publication no 317: 2013 is 2026 (part 1) standard testing lab in congo
  •  
  • distribution /power transformers , upto 33 kv class testing lab in congo
  • full wave lightning impulse test for the line terminals (li) testing lab in congo
  • is 2026-3 cl. no. 13, 14 iec 60076-3 cl. no. 13 is 1180-1 cl. no. 21.3.a is 11171 cl. no. 16 iec 60076-11 cl. no. 21 standard testing lab in congo
  •  
  • distribution /power transformers , upto 33 kv class testing lab in congo
  • chopped wave lightning impulse test for theline terminals (lic) testing lab in congo
  • is 2026-3 cl. no. 14 is 1180-1 cl. no. 21.3.a iec:60076- 3 cl. no. 14 table 4 of iec 60076-11 cbip 217:2013 cl. no. 6.2 standard testing lab in congo
  •  
  • distribution /power transformers , upto 33 kv class testing lab in congo
  • lightning impulse test for the neutral terminals (lin) testing lab in congo
  • iec 60076-03cl.no. 13.3.2 is 2026-03 cl. no. 13.3.2 is 1180-1 cl. no. 21.3.a standard testing lab in congo
  •  
  • current transformer upto 33 kv testing lab in congo
  • lightning impulse testing lab in congo
  • is 2705 (part 1) cl. no. 9.8 is 16227-1 cl. no. 7.2.3.2 is 16227 (part 4) cl. no. 7.2.3 is 16227 (part 2) cl. no. 7.2.3 standard testing lab in congo
  •  
  • potential transformer up to 33 kv testing lab in congo
  • lightning impulse voltage test on primary terminal testing lab in congo
  • is 3156 (part 1) cl. no. 9.6 is 16227-1 cl. no. 7.2.3.2 is 16227 (part 4) cl. no. 7.2.3 is 16227 (part 3) cl. no. 7.2.3 standard testing lab in congo
  •  
  • potential transformer up to 33 kv testing lab in congo
  • chopped impulse for external insulation testing lab in congo
  • is 3156 (part 1) cl. no. 9.8 is 16227 (part 4) cl. no. 7.4.1 is 16227 (part 3) cl. no. 7.4.1 standard testing lab in congo
  •  
  • insulator,bushing upto 36 kv testing lab in congo
  • dry impulse withstand voltage testing lab in congo
  • is 731 cl. no. 10.3 is 2544 cl. no. 9.3 is 9431 cl. no. 9.2 is 2099 cl. no. 11.4 standard testing lab in congo
  •  
  • insulator,bushing upto 36 kv testing lab in congo
  • fifty percent dry impulse flashover voltage testing lab in congo
  • is 731 cl. no. 10.3.5 is 2544 cl. no. 9.3.6 is 9431 cl. no. 9.2 is 2099 cl. no. 11.4 standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • voltage ratio testing lab in congo
  • iec 60076-01 : 2011 (clause 10.3) is 2026-01 : 2011 (clause 10.3) ieee c57.12.00 : 2010 (table 18) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • check of winding polarity / check of vector group testing lab in congo
  • iec 60076-01 : 2011 (clause 10.3) is 2026-01 : 2011 (clause 10.3) table 18 of ieee c57.12.00 : 2010 standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • winding resistance testing lab in congo
  • iec 60076-01 : 2011 (clause 10.2) is 2026-01 : 2011 (clause 10.2) ieee c57.12.00 : 2010 (table 18 standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • capacitance testing lab in congo
  • iec 60076-01 : 2011 (clause 10.1.3 (b)) is 2026-01 : 2011 (clause 10.1.3 (b)) ieee c57.12.00 : 2010 (table 18) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • tan delta testing lab in congo
  • iec 60076-01 : 2011 (clause 10.1.3 (b)) is 2026-01 : 2011 (clause 10.1.3 (b)) ieee c57.12.00 : 2010 (table 18) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • magnetic balance test testing lab in congo
  • cbip section - bb : 2013 (clause 3.17) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • insulation resistance of windings, core, frame &tank. testing lab in congo
  • iec 60076-01: 2011 (clause 10.1.3 (i)) is 2026-01: 2011 (clause 10.1.3 (i)) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • no load losses and current testing lab in congo
  • iec 60076-01 : 2011 (clause 10.5) is 2026-01 : 2011 (clause 10.5) ieee c57.12.90 : 2010 (clause.8) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • short-circuit impedance and load loss testing lab in congo
  • iec 60076-01 : 2011 (clause 10.4) is 2026-01 : 2011 (clause 10.4) ieee c57.12.90 : 2010 (clause.9) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • full wave lightning impulse test for the line terminals (li) testing lab in congo
  • iec 60076-03 : 2013 (clause 13.2) is 2026-03 : 2009 (clause 13) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • chopped wave lightning impulse test for the line terminals (lic) testing lab in congo
  • iec 60076-03 : 2013 clause 13.3 is 2026-03 : 2009 clause 14 ieee c57.12.90 : 2010 clause.10.3 standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • lightning impulse test for the neutral terminals (lin) testing lab in congo
  • iec 60076-03 : 2013 (clause 13.4) is 2026-03 : 2009 (clause 13.3.2) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • switching impulse test for the line terminal (si) testing lab in congo
  • iec 60076-03 : 2013 (clause 14) is 2026-03:2009 (clause 15) ieee c57.12.90 : 2010 (clause.10.2) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • applied voltage test (av) / separate source ac withstand voltage test testing lab in congo
  • iec 60076-03 : 2013 (clause 10) is 2026-03 : 2009 (clause 11) ieee c57.12.90 : 2010 (clause.10.6) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • induced voltage withstand test (ivw) testing lab in congo
  • iec 60076-03 : 2013 (clause 11.2) is 2026-03 : 2009 (clause 12) ieee c57.12.90 : 2010 (clause.10.8) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • induced voltage test with pd measurement (ivpd) testing lab in congo
  • iec 60076-03 : 2013 (clause 11.3) is 2026-03 : 2009 (clause 12.4) ieee c57.12.90 : 2010 (clause.10.8) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • line terminal ac withstand voltage test (ltac) testing lab in congo
  • iec 60076-03 : 2013 (clause 12) is 2026-03 : 2009 (clause 12.2 & 12.3) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • auxiliary wiring (auxw) & magnetic circuit insulation test testing lab in congo
  • iec 60076-03 : 2013 (clause 9) is 2026-03 : 2009 (clause 10) ieee c57.12.00 : 2010 table 18 standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • tests on on-load tap-changers testing lab in congo
  • iec 60076-01 : 2011 (clause 10.8) is 2026-01 : 2011 (clause 10.8) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • temperature rise test testing lab in congo
  • iec 60076-02 : 2011 (clause 7) is 2026-02 : 1977 (clause 4) ieee c57.12.90 : 2010 (clause.11) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • transient voltage transfer characteristics testing lab in congo
  • iec 60076-03 : 2013 (clause b2) annex-b is 2026-03 : 2009 (clause 13.3.3) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • sound levels testing lab in congo
  • iec 60076-10 : 2001 (clause 11) is 2026-01 : 2011 (clause 10.1.3(f)) ieee c57.12.90 : 2010 (clause.13.5) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • zero-sequence impedance(s) on three-phase transformers testing lab in congo
  • iec 60076-01 : 2011 (clause 10.7) is 2026-01 : 2011 (clause 10.7) ieee c57.12.90 : 2010 (clause.9.5) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • harmonics of the no-load current testing lab in congo
  • iec 60076-01 : 2011 (clause 10.6) is 2026-01 : 2011 (clause 10.6) ieee c57.12.90 : 2010 (clause.8) standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • power taken by the fan and oil pump motors testing lab in congo
  • iec 60076-01 : 2011 (clause 10.1.3(h)) is 2026-01 : 2011 (clause 10.1.3(h)) ieee c57.12.00 : 2010 table 18 standard testing lab in congo
  •  
  • power & auto transformer- upto 500mva,765kv, 1 phase & 500 mva, 3 phase , 650 kv testing lab in congo
  • sweep frequency response analysis (sfra) test testing lab in congo
  • iec 60076-18 : 2010 standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • winding resistance testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.2) iec 60076-01 : 2011 (clause 10.2) is 2026-01 : 2011 (clause 10.2) ieee c57.12.00 : 2010 table 18 standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • capacitance testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-01 : 2011 (clause 10.1.3 (b)) is 2026-01 : 2011 clause 10.1.3 (b) ieee c57.12.00 : 2010 table 18 standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • insulation resistance of windings, core, frame and shields. testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-01: 2011 (clause 10.1.3 (i)) is 2026-01: 2011 (clause 10.1.3 (i)) ieee c57.12.90:2010 (clause. 10.11) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • full wave lightning impulse test for the line terminals testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 13.2) is 2026-03 : 2009 (clause 13) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • chopped wave lightning impulse test for the line terminals (lic) testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 13.3) is 2026-03 : 2009 (clause 14) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • lightning impulse test for the neutral terminals (lin) testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 13.4) is 2026-03 : 2009 (clause 13.3.2) ieee c57.12.90 : 2010 (clause.10.3) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • switching impulse test for the line terminal (si) testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 14) is 2026-03 : 2009 (clause 15) ieee c57.12.90 : 2010 clause.10.2 standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • applied voltage test (av) / separate source ac withstand voltage test testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 10) is 2026-03 : 2009 (clause 11) ieee c57.12.90 : 2010 (clause.10.6) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • induced voltage withstand test (ivw) testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 11.2) is 2026-03 : 2009 (clause 12) ieee c57.12.90 : 2010 (clause.10.8) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • induced voltage test with pd measurement (ivpd) testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 11.3) is 2026-03 : 2009 (clause 12.4) ieee c57.12.90 : 2010 (clause.10.8) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • line terminal ac withstand voltage test (ltac) testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.10) iec 60076-03 : 2013 (clause 12) is 2026-03 : 2009 (clause 12.2 & 12.3) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • auxiliary wiring (auxw) & magnetic circuit insulation test testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.3) iec 60076-03 : 2013 (clause 9) is 2026-03 : 2009 (clause 10) ieee c57.12.00 : 2010 table 18 standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • temperature rise test testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.14) iec 60076-02 : 2011 (clause 7) is 2026-02 : 1977 (clause 4) ieee c57.12.90 : 2010 (clause.11) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • sound levels testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.12) iec 60076-10 : 2001 (clause 11) is 2026-01 : 2011 (clause 10.1.3(f)) ieee c57.12.90 : 2010 (clause.13.5) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • harmonics of the no-load current testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.7) iec 60076-01 : 2011 (clause 10.6) is 2026-01 : 2011 (clause 10.6) ieee c57.12.90 : 2010 (clause.8) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • power taken by the fan and oil pump motors testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.3) iec 60076-01 : 2011 (clause 10.1.3(h)) is 2026-01 : 2011 (clause 10.1.3(h)) ieee c57.12.00 : 2010 table 18 standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • sweep frequency response analysis (sfra) test testing lab in congo
  • iec 60076-18 : 2010 standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • reactance & loss testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.5 & 7.8.6) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • vibration testing lab in congo
  • iec 60076-06 : 2007 (clause 7.8.13) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • strain and stress testing lab in congo
  • iec 60076-06 : 2007) (clause 7.8.13) standard testing lab in congo
  •  
  • reactors upto 110mvar,765kv testing lab in congo
  • determination linearity of reactance. testing lab in congo
  • iec 60076-06 : 2007 clause 7.8.5.3 standard testing lab in congo
  •  
  • loco transformer upto 7.5 mva, 25kv testing lab in congo
  • voltage ratio testing lab in congo
  • iec 310: 1991-11 clause 20 standard testing lab in congo
  •  
  • loco transformer upto 7.5 mva, 25kv testing lab in congo
  • winding resistance testing lab in congo
  • iec 310: 1991-11 clause 19 standard testing lab in congo
  •  
  • loco transformer upto 7.5 mva, 25kv testing lab in congo
  • insulation resistance of windings testing lab in congo
  • iec 60076-01: 2011 clause 10.1.3 (i) is 2026-01: 2011 clause 10.1.3 (i) ieee c57.12.90 : 2010 clause. 10.11 standard testing lab in congo
  •  
  • loco transformer upto 7.5 mva, 25kv testing lab in congo
  • no load losses and current testing lab in congo
  • iec 310: 1991-11 clause 21.2 standard testing lab in congo
  •  
  • loco transformer upto 7.5 mva, 25kv testing lab in congo
  • short-circuit impedance and load loss testing lab in congo
  • iec 310: 1991-11 clause 22 & 23 standard testing lab in congo
  •  
  • loco transformer upto 7.5 mva, 25kv testing lab in congo
  • separate source ac withstand voltage test testing lab in congo
  • iec 310: 1991-11 clause 36.2 standard testing lab in congo
  •  
  • loco transformer upto 7.5 mva, 25kv testing lab in congo
  • induced voltage withstand test testing lab in congo
  • iec 310: 1991-11 clause 26.1 standard testing lab in congo
  •  
  • loco transformer upto 7.5 mva, 25kv testing lab in congo
  • temperature rise test testing lab in congo
  • iec 310: 1991-11 clause 25 standard testing lab in congo
  •  
  • loco transformer upto 7.5 mva, 25kv testing lab in congo
  • full wave lightning impulse test for the line terminals testing lab in congo
  • iec 60076-03 : 2013 clause 13.2 is 2026-03 : 2009 clause 13 ieee c57.12.90 : 2010 clause.10.3 standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • electric strength breakdown voltage (bdv) testing lab in congo
  • iec 60156:1995 is 6792 (2003 ) standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • water content testing lab in congo
  • iec 60814:1997 is 13567 (ra 2003) standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • specific resistance testing lab in congo
  • iec 60247:2004 is 6103 (ra 2006 ) standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • dielectric dissipation testing lab in congo
  • iec 60247:2004 is 6262 (ra 2006 ) standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • interfacial tension testing lab in congo
  • astm d0971-12:2012 is 6104 (ra 2006) standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • dissolved gas analysis testing lab in congo
  • astm d0971-12:2012 is 6104 (ra 2006) standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • hydrogen testing lab in congo
  • iec 60567:2005 iec 60599:2007 ieee-c57.104 :1991 astm d3612-02:2002 standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • co2 testing lab in congo
  • iec 60567:2005 iec 60599:2007 ieee-c57.104 :1991 astm d3612-02:2003 standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • co testing lab in congo
  • iec 60567:2005 iec 60599:2007 ieee-c57.104 :1991 astm d3612-02:2004 standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • hydrocarbons testing lab in congo
  • iec 60567:2005 iec 60599:2007 ieee-c57.104 :1991 astm d3612-02:2005 standard testing lab in congo
  •  
  • mineral oil testing lab in congo
  • particle count testing lab in congo
  • iso 4402:1992 & iso 11171:2016 standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • full load performance power testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • engine steady state cycle testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • co testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • thc testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • nox testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • pm testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • nh3 testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • engine transient cycle testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • co testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • thc testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • nox testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • pm testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • ch4 testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • nh3 testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • 8 mode emission test testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • co testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • thc testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • nox testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • pm testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • 5 mode emission test testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • co testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • thc testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • nox testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • pm testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • internal combustion engines testing lab in congo
  • error code for obdii testing lab in congo
  • morth/cmvr/tap/115 116 issue-4:2010 inclusive of amendments iso 8178:2008 edc-tpm-01 \ issue no. 01\ issue date 02.01.2017\ revision number 00\ annexure vi. standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv
  • voltage ratio testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.3 iec60076-1 (2011) cl.no.11.3 ieee-c57.12.90 (2010) cl.no.7.0 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv
  • vector group testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.3 iec60076-1(2011) ) cl.no.11.3 ieee-c57.12.90 (2010) cl.no.6.0 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv
  • check of polarity testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.3 iec60076-1(2011) ) cl.no.11.3 ieee-c57.12.90 (2010) cl.no.6.0 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv
  • winding resistance testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.2 iec60076-1(2011) ) cl.no.11.2 ieee-c57.12.90 (2010) cl.no.5.3 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva
  • insulation resistance testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.1.3 (j) iec60076-1(2011) cl.no.11.1.2.2(b), cl.no.11.1.4 (h) standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva
  • ieee-c57.12.90 (2010) cl.no.10.11 standard testing lab in
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single
  • capacitance & tan delta insulation power factor testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.1.3 (b) iec60076-1(2011) cl.no.11.1.2.2 (a,c), cl.no.11.1.4 (c,d) ieee-c57.12.90 (2010) cl.no.10.10 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva
  • harmonics of no load current testing lab in
  • is 2026 (part 1): 2011 cl.no.10.6 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv
  • load loss testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.4 iec60076-1(2011) ) cl.no.11.4 ieee-c57.12.90 (2010) cl.no.9.0 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva
  • impedance voltage testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.4 iec60076-1(2011) cl.no.11.4 ieee-c57(2010) ) cl.no.9.0 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase
  • oltc testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.8 iec60076-1(2011) cl.no.11.7 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv
  • zero phase sequence impedance on three phase transformers & reactors testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.7 iec60076-1(2011) cl.no.11.6 ieee-c57.12.90 (2010) cl.no.9.5 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v16 testing lab in congo
  • temperature rise testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.1.2 (a) standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v17 testing lab in congo
  • iec60076-2(2011) cl.no.11.1.3 (a) ieee-c57.12.90 (2010) cl.no.11 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v18 testing lab in congo
  • separate source voltage withstand testing lab in congo
  • is 2026 (part 1): 2011 cl.no.11 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v19 testing lab in congo
  • applied voltage testing lab in congo
  • ieee-c57.12.90 (2010) cl.no.10.6 iec60076-3-(2018) cl.no.7.2.3 (c) standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v20 testing lab in congo
  • line terminal ac withstand (ltac) induced voltage withstand ( ivw) testing lab in congo
  • iec60076-1(2011)& cl.no.7.2.3 (d) ieee-c57.12.90 (2010) cl.no.10.7 iec60076-3-(2018) cl.no.7.2.3 (e) standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v21 testing lab in congo
  • acsd/acld voltage withstand with pd induced voltage with partial discharge (ivpd) testing lab in congo
  • is 2026 (part 1): 2011 cl.no.12.2,12.3, 12.4 ieee-c57.12.90 (2010) cl.no.10.9 iec60076-3-(2018) cl.no.7.2.3 (d) standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v22 testing lab in congo
  • lightning impulse (li, lic, lin, limt) testing lab in congo
  • is 2026 (part 1): 2011 cl.no.13,13.3.2 ieee-c57.12.90 (2010) cl.no.10.3 iec60076-3-(2018) cl.no.7.2.3 (a) standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v23 testing lab in congo
  • switching impulse (si) testing lab in congo
  • is 2026 (part 1): 2011 cl.no.15 ieee-c57.12.90 (2010) cl.no.10.2 iec60076-3-(2018) cl.no.7.2.3 (d) standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v24 testing lab in congo
  • noise level audible sound emission testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.1.3 (f) iec60076-10(2016) ieee-c57.12.90 (2010) cl.no.13 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v25 testing lab in congo
  • power taken by fan & pump (cooler loss) testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.1.3 (h)iec60076-1 (2011) cl.no.11.1.3 (c) standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v26 testing lab in congo
  • ct ratio error & phase angle error testing lab in congo
  • iec 61869-2 (2012) standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v27 testing lab in congo
  • no load loss & excitation current testing lab in congo
  • is 2026 (part 1): 2011 cl.no.10.5 iec60076- 1(2011) cl.no.11.5 ieee-c57.12.90 (2010) cl.no.8.0 standard testing lab in congo
  •  
  • three phase 7.5 mva to 500 mva 6.9 kv to 400kv single phase 30.24 mva to 350 mva 27kv to 500kv generating transformer single phase, 25 mva to 270 mva 11kv to kv: 400/ v28 testing lab in congo
  • sfra testing lab in congo
  • iec60076-1 cl.no.11.1.4 (l) standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • winding resistance testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.3 (a) iec60076-6 (2007) cl.no.7.8.2 ieee-c57.12.90 (2010) cl.no.5.3 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • insulation resistance testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.3 (b), iec60076-6(2007) cl.no.7.8.2 ieee-c57.12.90 (2010) cl.no.10.11 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • capacitance tan delta testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.4 (h), iec60076-6(2007) cl.no.7.8.2/ieee-c57.12.90 (2010) cl.no.10.10 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • harmonicsofno load current testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.4 (e), iec60076-6(2007) cl.no.7.8.7 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • loss & reactance testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.3 (d), iec60076-6(2007) cl.no.7.8.5 ,7.8.6 ieee-c57.12.90 (2010) cl.no.8.0 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • linearity of reactance testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.12, iec60076-6(2007) cl.no.7.8.5.3 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • zero sequence impedance on three phase reactors testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.4 (a), iec60076-6(2007) cl.no.7.8.8 ieee-c57.12.90 (2010) cl.no.9.5 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • temperature rise testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.2 (g), iec60076-6(2007) cl.no.7.8.14 ieee-c57.12.90 (2010) cl.no.11 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • separate source voltage withstand testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.11.1, iec60076-6(2007) cl.no.7.8.10.2 ieee-c57.12.90 (2010) cl.no.10.6 iec60076-3-(2018) standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • induced over voltage testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.11.2, standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • induced voltage withstand (ivw)& (ivpd ) testing lab in congo
  • iec60076-6 (2007) cl.no.7.8.10.3 ieee-c57.12.90 (2010) cl.no.10.9 iec60076-3-(2018) cl.no.7.2.3 (e) cl.no.7.2.3 (e) standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • lightning impulse (li,lic,lin,limt) testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.11.3 , iec60076-6(2007) cl.no.7.8.10.4 ieee-c57.12.90 (2010) cl.no.10.7 iec60076-3- (2013)&cl.no.7.2.3 (a) standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • switching impulse testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.11.4, iec60076-6(2007) cl.no.7.8.10.6 ieee-c57.12.90 (2010) cl.no.10.2 iec60076-3-(2013) cl.no.7.2.3 (d) standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • noise level testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.13, iec60076-6(2007) cl.no.7.8.12 (iec60076- 10(2016) ieee-c57.12.90 (2010) cl.no.13 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • power taken by fan & pump (cooler loss) testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.4 (f), iec60076-1(2011) cl.no.11.1.3 (c) standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • vibration testing lab in congo
  • is 5553 (part 2): 1990 cl.no.7.14, iec60076-6 (2007) cl.no.7.8.13 standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • ct ratio error & phase angle error re pe testing lab in congo
  • iec61869-2 (2012) standard testing lab in congo
  •  
  • reactor three phase 125 mvar,420 kv 20 mvar, 33 kv single phase 60 mvar, 500 kv 5 mvar, 145 kv single phase neutral grounding reactor 0.04 mvar to 1.64 mvar 64 kv to 220 kv testing lab in congo
  • sfra testing lab in congo
  • iec60076-1&cl.no.11.1.4 (l) standard testing lab in congo
  •  
  • electrical steel testing lab in congo
  • surface insulation resistivity testing lab in congo
  • astm 717- (1995), iec 60404-11(1996) is 649-(1997) standard testing lab in congo
  •  
  • electrical steel testing lab in congo
  • specific core loss testing lab in congo
  • iec 60404-2 (1996), astm a343 (1997), is 649-(1997) standard testing lab in congo
  •  
  • electrical steel testing lab in congo
  • a. c. magnetization testing lab in congo
  • iec 60404-2 (1996), astm a343 (1997), is 649:1997 standard testing lab in congo
  •  
  • electrical steel testing lab in congo
  • ageing characteristic at 250 °c for 24hrs. core loss testing lab in congo
  • is 649:1997 standard testing lab in congo
  •  
  • electrical steel testing lab in congo
  • stacking factor testing lab in congo
  • is 649:1997 standard testing lab in congo
  •  
  • electrical steel testing lab in congo
  • bend testing lab in congo
  • is 649:1997 standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • density testing lab in congo
  • iso 3675-(1998) astm d1298 (2005) bs 148 (7.2): (1998) is 1448 (part 16): 1976 standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • break down voltage testing lab in congo
  • astm d 877: (2007) bs 148 (1998) (7.11) iec 60156-07(1995), is 6792 (1998) standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • tan delta testing lab in congo
  • astm d 924: (2004) bs 148 (1998) (7.12) iec 60247-02 (2004), is 6262 (1996) standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • specific resistivity at 27 °c & 90 °c testing lab in congo
  • is 6103 (1996) standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • water content testing lab in congo
  • astm d 1533: (2005) bs 148 (1998) (7.8) iec 60814-1-(1997) is 13567 : (1992) standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • neutralisation value testing lab in congo
  • astm d 974: (2007) bs 148 (1998) (7.6) iec 62021-12(2001) is 1448 -2 (1967) standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • inter facial tension testing lab in congo
  • astm d 971 (2004) is 6104 (1971) iso 6295: (1983) standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • kinematic viscosity at 40° c testing lab in congo
  • astm d 445:2006/bs 148(1998) (7.3)/iec608141(1997)/is 1448 -25-1976 standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • kinematic viscosity at 27° c testing lab in congo
  • astm d 445: (2006) bs 148 (1998) (7.3)iec 60814-1(1997)is 1448-25 (1976) standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • dissolved gas analysis testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • hydrogen testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • oxygen testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • nitrogen testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • carbon monoxide testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • methane testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • carbon dioxide testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • acetylene testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • ethylene testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • insulating oil testing lab in congo
  • ethane testing lab in congo
  • iec 60567 2011 iec 61181 2012-03 addition 2.1 astm 3612method c standard testing lab in congo
  •  
  • power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)winding resistanceis 2026 (part 1) iec60076-1, cl.10.2 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)voltage ratio and check of voltage vector relationshipis 2026 (part 1) iec 60076-1, cl.10.3 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)impedance(principal tapping) and load lossis 2026 (part 1) iec60076-1, cl.10.4 , is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)no-load loss and currentis 2026 (part 1) iec60076-1, cl.10.5 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)insulationresistance& polarization indexdpltl/tp/04, issue 01, rev 00, date: 01/03/2016
  •  
  • power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)dielectric tests – separate-source voltage withstand test,is 2026 (part 3) iec60076-3, cl.11 power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)inducedovervoltage withstand testis 2026 (part 3) iec60076-3, cl.12 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)temperature riseis 2026 (part 2) iec60076-2 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage classup to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)zero-sequence impedance of three phase transformeris 2026 (part 1) iec60076-1, cl. 10.7 is 1180 (part 1) power transformers (5 kva to 5 mva, 3-phase voltage class up to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)magnetic balance test for three phase transformercbip manual, cl.7.3
  •  
  • power transformers (5 kva to 5 mva, 3-phase voltage class up to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)no load current at all adjustmentsis 2026 (part 1) iec60076-1, cl.10.6 power transformers (5 kva to 5 mva, 3-phase voltage class up to 33 kv) distribution transformers (non- sealed 16kvato 2500 kva, 3- phase voltage class upto 33 kv)transformer oil dielectric test (bdv)is 6792
  •  
     
    list of our services following cities
     
    brazzaville | pointe-noire | dolisie | nkayi | kindamba | impfondo | ouésso | madingou | owando | sibiti | loutété | bouansa | gamboma | mossaka | mindouli | oyo | makoua | loudima | mossendjo | mouyondzi | bétou | djambala | pokola | ngo | makabana | kinkala | ewo | etoumbi | boundji | dongou | komono | kellé | enyellé | tchamba-nzassi | ollombo | loukoléla | sembé | mbinda | zanaga | lekana | aba | aketi | ango | aru | bafwasende | bagata | bakwa-kalonji | balamba | bambesa | banana | bandundu | baraka | basankusu | basoko (basoko-bandu) | befale | beni | bikoro | binga | boende | bokoro | bokungu (bokungo) | bolobo | bolomba | boma | bomongo | bondo | bongandanga | bosobolo | budjala | bukama (bukama-kibanda) | bukavu | bulungu | bumba | bunia | businga (mombombo) | buta | butembo | dekese | demba | dibaya | dibaya-lubue (dibaya-lubwe) | dilolo | dilunga | dimbelenge | djugu | dungu | feshi | fizi | fungurume | gandajika (ngandajika) | gbadolite | gemena | goma | gungu | gwane | idiofa | idjwi | ikela | ilebo (port-franqui) | inga | ingende | inkisi (kisantu) | inongo | irumu | isangi | kabalo | kabambare | kabeya-kamwanga (kenankuna) | kabinda | kabongo | kahemba | kalemie | kalima (kamisuku) | kalo | kambove | kamina | kamituga | kampene | kananga | kaniama | kanteba (kateba) | kanyabayonga | kapanga | kasangulu | kasenga | kasongo | kasongo-lunda | katako-kombe | katanda | katwa | kayna | kazumba | kenge | kibombo | kikwit | kimpese | kindu | kinshasa | kinzau-mvuete (kinzau-vuete) | kipamba (kikondja) | kipushi | kiri | kirumba | kisangani | kitona | kituku | kole | kolwezi | kongolo | kungu | kutu | libenge | likasi | lisala | lodja | lomela | lubao (sentery) | lubefu | lubero | lubudi | lubumbashi | lubutu | luebo | luiza | lukolela | lukula | lukunga mputu | luozi | lupatapata (luhatahata) | luputa | lusambo | lwambo (luambo) | mahagi | malemba-nkulu | mangai (mangaï) | mangina, mankanza | manono | masi-manimba | masisi | matadi | mbandaka (coquilhatville) | mbanza-ngungu (thysville) | mbuji-mayi (bakwanga) | miabi | mitwaba | moba (baudouinville) | mobayi-mbongo | mokambo | mongbwalu | monkoto | muanda (moanda) | mulongo | mushie | mutshatsha | mweka | mwene-ditu | niangara | nioki | nyunzu | oicha | opala | oshwe | poko | popokabaka | punia | pweto | rutshuru | sakania | sandoa | sedzo | seke-banza | shabunda | shinkolobwe | songololo | tshela | tshikapa | tshilenge | tshimbulu | ubundu | uvira | vivi | walikale | walungu | wamba | watsa | yahuma | yakoma | yangambi | zaba | zongo ....